Carrigogna Midleton

CONDITIONAL

Planning application 08/8471

Cork - Cork County Council

Proposed Development

Construction of split level single storey dwelling and installation of wastewater treatment unit

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Aug 2008

  2. Decision: CONDITIONAL

    26 Mar 2009

  3. Decision due

    29 Mar 2009

  4. Grant issued

    28 Apr 2009

Application Details

Location
Carrigogna Midleton
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
20 August 2008
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 March 2009
Grant Date
28 April 2009

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
08/8049INCOMPLETED APPLICATION23 Jul 2008

Construction of split level single storey dwellinghouse and installation of waste water treatment unit

Carrigogna Midleton

0m
08/4415WITHDRAWN29 Jan 2008

Split level dwelling and installation of wastewater treatment unit

Carrigogna Midleton

0m
07/4828CONDITIONAL7 Feb 2007

Dwellinghouse and alterations to adjacent vehicular entrance for access to proposed dwelling

Carrigogna Midleton

2m
06/7079REFUSED11 May 2006

Dwellinghouse

Carrigogna Midleton

45m
23/5310CONDITIONAL27 Jun 2023

A) Conservatory to front of dwelling house. B) Minor modifications to windows and door openings on front elevation and C) Timber framed shed to side of dwelling.

Carrigogna Midleton Co Cork

76m
03/2075CONDITIONAL2 May 2003

Construction of ground floor and 1st floor extensions to dwelling and partial demolition of extension

CARRIGOGNA, CARRIGOGNA,

220m
23/5246CONDITIONAL19 Jun 2023

10 year permission to develop an Energy Storage System, which will connect to the adjoining ESB Midleton 110kV Electricity Substation. The proposed development will have a projected life span of 30 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.0.83 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 13 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure.

Carrigogna Midleton Co Cork

223m
18/4550CONDITIONAL7 Mar 2018

Development of grid system services facility within a total site area of up to 0.76 hectares, to include 1 no. single storey electrical substation building, 1 no. customer switcher gear, electrical inverter/transformer station modules, containerised battery storage modules on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and new site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV security monitoring system, animal fencing, earth bund and landscaping works and all associated ancillary infrastructure on land.

Carrigogna Midleton Co. Cork

298m
22/5789CONDITIONAL29 Jul 2022

Alterations to the existing Midleton 110kV station to include a single storey extension on the northern side of the existing control building and the extension of the existing compound palisade fence to the north of the site.

Carrigogna Midleton Co. Cork

302m
25/6374Grant with Conditions3 Nov 2025

A 10-year permission for a solar farm consisting of solar photovoltaic panels on ground mounted frames, 1 single-storey delivery station, 1 single-storey transformer station, 1 single-storey spare parts storage container, construction of a new site entrance off the L - 36014 local road, internal access tracks, security fencing, CCTV, landscaping and all associated development site works. The solar panels are arranged within a total developable site area (including ancillary works) of 8.85ha at Carrigogna, Midleton, Co. Cork. This development is covered by the provisions of the Renewable Energy Directive III (directive(EU) 2023/2024) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Carrigogna, Midleton, Co. Cork