Carrigogna Midleton Co Cork

CONDITIONAL

Planning application 23/5310

Cork - Cork County Council

Proposed Development

A) Conservatory to front of dwelling house. B) Minor modifications to windows and door openings on front elevation and C) Timber framed shed to side of dwelling.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Jun 2023

  2. Decision due

    21 Aug 2023

  3. Decision: CONDITIONAL

    21 Aug 2023

  4. Grant issued

    29 Sept 2023

Application Details

Location
Carrigogna Midleton Co Cork
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
27 June 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
21 August 2023
Grant Date
29 September 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

44m
06/7079REFUSED11 May 2006

Dwellinghouse

Carrigogna Midleton

45m
08/8471CONDITIONAL20 Aug 2008

Construction of split level single storey dwelling and installation of wastewater treatment unit

Carrigogna Midleton

45m
08/8049INCOMPLETED APPLICATION23 Jul 2008

Construction of split level single storey dwellinghouse and installation of waste water treatment unit

Carrigogna Midleton

45m
08/4415WITHDRAWN29 Jan 2008

Split level dwelling and installation of wastewater treatment unit

Carrigogna Midleton

45m
07/4828CONDITIONAL7 Feb 2007

Dwellinghouse and alterations to adjacent vehicular entrance for access to proposed dwelling

Carrigogna Midleton

66m
03/2075CONDITIONAL2 May 2003

Construction of ground floor and 1st floor extensions to dwelling and partial demolition of extension

CARRIGOGNA, CARRIGOGNA,

177m
23/5246CONDITIONAL19 Jun 2023

10 year permission to develop an Energy Storage System, which will connect to the adjoining ESB Midleton 110kV Electricity Substation. The proposed development will have a projected life span of 30 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.0.83 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 13 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure.

Carrigogna Midleton Co Cork

179m
18/4550CONDITIONAL7 Mar 2018

Development of grid system services facility within a total site area of up to 0.76 hectares, to include 1 no. single storey electrical substation building, 1 no. customer switcher gear, electrical inverter/transformer station modules, containerised battery storage modules on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and new site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV security monitoring system, animal fencing, earth bund and landscaping works and all associated ancillary infrastructure on land.

Carrigogna Midleton Co. Cork

254m
22/5789CONDITIONAL29 Jul 2022

Alterations to the existing Midleton 110kV station to include a single storey extension on the northern side of the existing control building and the extension of the existing compound palisade fence to the north of the site.

Carrigogna Midleton Co. Cork

261m
15/5441CONDITIONAL1 Jul 2015

Alterations to the existing Midleton 110kV station to include; extension to the existing compound palisade fence, single storey side extension to the existing control building, 1 no. 18meter high monopole, 1 no. transformer and transformer bay, associated drainage and site works

Midleton 110 kV Carrigogna Midleton Co. Cork