← Back to search

Lacka Cross Lackanastooka Ballydesmond

INCOMPLETED APPLICATION

Planning application 09/6084

Cork - Cork County Council

Proposed Development

Construction of 40sqm building located at the first floor level above the existing air compressor building to be used to house hardwood paint spraying equipment

View the full application file on the council's planning portal →

Application Details

Location
Lacka Cross Lackanastooka Ballydesmond
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
25 June 2009
Status
INCOMPLETED APPLICATION
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
09/6494CONDITIONAL27 Jul 2009

Construction of 40 sq.m building located at the first floor level above the existing air compressor building, external access stairs will provide access to the building. The building will be used to house hardwood paint spraying equipment

Munster Joinery Lacka Cross Lackanastooka Ballydesmond

0m
09/6259INCOMPLETED APPLICATION7 Jul 2009

A 40 sq.m building located at the 1st floor level above the existing air compressor building. The building will be used to house hardwood paint spraying equipment

Munster Joinery Lacka Cross Lackanastooka Ballydesmond

18m
08/8230CONDITIONAL1 Aug 2008

Construction of weights saw building to be used for cutting counter weights for window manufacturing

Lacka Cross Lackanastooka Ballydesmond

57m
07/6903CONDITIONAL10 Apr 2007

Construction of off size sales building for storage of doors and windows for resale to general public

Munster Joinery Lacka Cross Lackanastooka Ballydesmond

71m
03/1255CONDITIONAL20 Mar 2003

Construction of building for the storage of small window and door fittings

LACKA CROSS, LACKA CROSS, LACKANASTOOKA,

74m
07/4377INCOMPLETED APPLICATION23 Jan 2007

Construction of sales building for storage of doors and windows for resale

Munster Joinery Lacka Cross Lackanastooka Ballydesmond

74m
07/4640REFUSED31 Jan 2007

Construction of service building for storage of glass panels and accessories

Munster Joinery Lacka Cross Lackanastooka Ballydesmond

90m
07/10679INCOMPLETED APPLICATION3 Sept 2007

Construction of single storey building to house equipment for treatment of water based waste paints for the purpose of reducing wastes exported from the site

Munster Joinery Lacka Cross Lackanastooka Ballydesmond

90m
07/10132INCOMPLETED APPLICATION7 Aug 2007

Construction of single storey building with bunding to house equipment for treatment of water based waste paints

Lacka Cross Lackanastooka Ballydesmond

90m
07/10042INCOMPLETED APPLICATION2 Aug 2007

Construction of extension to main joinery building to increase production area and replacement of existing compressed air facility

Munster Joinery Lacka Cross Lackanastooka Ballydesmond

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?