Proposed Development
Alterations & extensions to existing dwelling
Application Timeline
Application received
19 Apr 2010
Decision due
13 Jun 2010
Decision: CONDITIONAL
14 Jun 2010
Grant issued
15 Jul 2010
Application Details
- Location
- Ballyviniter Lower Mallow
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 19 April 2010Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 June 2010
- Grant Date
- 15 July 2010
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Domestic garage, play room and utility shed
Ballyviniter Lower Mallow
Demolition of dwelling and construction of bungalow
Ballyviniter Lower Mallow
Erection of 38kV steel mast
Ballyviniter Lower Mallow
To construct a two-storey house and all associated site works.
26a Hazelbrooke Spa Glen Mallow Co. Cork
Construct a two-storey house and all associated site works.
26a Hazelbrooke Spa Glen Mallow Co. Cork
To construct a two-storey house and all associated site works.
26a Hazelbrooke Spa Glen Mallow Co. Cork
Installation of a 0.50m x 0.87m x 1.62m (LxWxH) above ground enclosure, to house a new natural gas District Regulating Installation including a 3m high ‘lamp post’ style relief vent stack with all ancillary services and associated site works to alter the network pressure.
Hazel Brooke Parkadallane Co. Cork
The construction of 18 no. dwellings houses consisting of 14 no. Type G, 3 bedroom semi detached dwellings, 4 no. Type C, 3 bedroom semi detached dwellings and ancillary site works. The proposed development is a change of plan and change of house type from that permitted under planning reference no. ABP-301429-18.
Hazel Hill Hazel Brooke Spaglen Mallow, Co. Cork
(1) The retention of an existing domestic garage/store, (2) for alterations to the front and side of existing dwelling and a single storey extension to the side of same dwelling and all associated and site works.
Ballyvorisheen TD & Ballyviniter Lower TD Mallow Co. Cork
Extensions to dwellinghouse
Meadowbrook Spaglen Mallow
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?