DePuy Ireland Ltd Loughbeg Ringaskiddy
CONDITIONALPlanning application 10/5142
Cork - Cork County Council
Proposed Development
Construction of new transformer building to rear of existing ESB sub-station and construction of new roof and cable gantry over the existing ESB sub-station and associated site works
Application Timeline
Application received
12 May 2010
Decision: CONDITIONAL
30 Jun 2010
Decision due
6 Jul 2010
Grant issued
3 Aug 2010
Application Details
- Location
- DePuy Ireland Ltd Loughbeg Ringaskiddy
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 12 May 2010
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 30 June 2010
- Grant Date
- 3 August 2010
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of new biomass boiler house incorporating a storage bunker
Loughbeg Ringaskiddy
Erection of 2 no. wind turbines with hub height of up to 100m, blade radius of up to 50.5m and overall height from ground to tip of blade of up to 150.5m, upgrade of existing site roads, construction of internal site tracks and all other associated works
Loughbeg Ringaskiddy Co Cork
a) The demolition of a 107 square metre single storey timber framed structure and cladded canopy within the loading bay area to the north of the existing production facility, b) the construction of 1 no. single storey extension within the loading bay area to the north and 1 no. single storey extension to the north west of the existing production facility and c) all associated modifications and site development works.
Loughbeg Ringaskiddy Co. Cork
Construction of new biomass boiler house incorporating a storage bunker
Depuy (Ireland) Ltd. Loughbeg Ringaskiddy
(a) an extension to previously granted permission, planning registration reference 06/8591, for a 240 square metre two storey office structure to the east side of the existing manufacturing facility (b) the retention of a 107 square metre single storey timber framed structure within the loading bay area to the north (c) the construction of a 222 sq metre single storey extension to open roofed waste storage compound to the north west increasing the total area for the compound to 422 sq metres, the original compound was previously granted permission, planning registration reference 06/8591 (d) the construction of a new 175 sq metre partially covered recycling area to the west of the site (e) the retention of a section of existing inner service link road to the east and (f) the construction of 70 car spaces to the south; all with associated site works. All of the above facilities are ancillary to the existing production and plant areas located at DePuy (Ireland)
Depuy (Ireland) Loughbeg Ringaskiddy
Construction of a 222sq metre single storey extension to the existing open roofed waste storage compound to the north west (Planning Reg. No. 01/4145) of the existing manufacturing facility increasing the total area for the compound to 422 sq metres. The above facility is ancillary to the existing production and plant areas
Loughhbeg Ringaskiddy Co. Cork
Construction of a 222 sq metre single storey extension to the existing open roofed waste storage compound to the north west of the existing manufacturing facility permitted under Pl. Reg. No. 01/4145 increasing the total area for the compound to 422sq metres. The above facility is ancillary to the existing production and plant areas
Loughbeg Ringaskiddy .
Retention of a 107 square meter single storey timber framed structure for office use within the loading bay area to the north of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas.
Loughbeg Ringaskiddy Co. Cork
Retention of 107sq.m single storey timber framed strucure for office use within the loading bay area to the north of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas.
Loughbeg Ringaskiddy Co. Cork
Retention of a 107 square metre single storey timber framed structure for office use within the loading bay area to the north of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas
Loughbeg Ringaskiddy .
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?