← Back to search

5 Clyda Court Mallow Co. Cork

CONDITIONAL

Planning application 10/55033

Cork - Cork County Council

Proposed Development

Permission for retention of extension to existing dwelling

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Aug 2010

  2. Decision due

    11 Oct 2010

  3. Decision: CONDITIONAL

    11 Oct 2010

  4. Grant issued

    16 Nov 2010

Application Details

Location
5 Clyda Court Mallow Co. Cork.
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
17 August 2010Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
11 October 2010
Grant Date
16 November 2010

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

37m
17/6722CONDITIONAL20 Oct 2017

Construction of residential development of 6 no. residential units. The proposed development consists of the construction of 6 no. 3 bed semi detached dwellings. Vehicular access is proposed off Clyda Court to the north of the site. Permission is sought for the development outlined including, but not limited to, landscaping, boundary treatments, car parking and all ancillary site development works

off Clyda Court Quartertown Lower Mallow Co. Cork

408m
24/6514Conditional Permission23 Dec 2024

Permission for the construction of 1 No. new light engineering high bay manufacturing & assembly workshop and 1 No. light engineering storage building adjacent to existing light engineering manufacturing buildings and all associated works.

Quartertown Industrial Estate Quartertown Lower Mallow Co. Cork

413m
08/55029CONDITIONAL19 May 2008

Permission for manufacturing and storage warehouse facility and associated site works

I.D.A. Industrial Estate Quartertown Mallow Co. Cork.

457m
06/55006CONDITIONAL3 Feb 2006

1) construction of warehouse building 2) extension of existing warehouse building and carrying out of all associated site works

Quartertown Ind Est Quartertown Lower Mallow Co. Cork.

491m
26/2305Application Withdrawn4 Sept 2026

To relocate an existing vehicular entrance ,onto the existing industrial estate road, from the west side of the site to the south side of the site, together with all associated site works

Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork, P51 XC7K

491m
26/2583Awaiting Recommendation6 Oct 2026

Permission for an additional vehicular entrance & driveway onto the existing industrial estate road to the south side of the existing premises, together with all associated site works.

Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork, P51 XC7K

525m
10/55026WITHDRAWN31 May 2010

Consturction of a toilet building within their existing allotment area adjacent to the Hi-Cone building as well as the laying of a new sewer through the Hi-Cone site to connect to the existing public sewer on the adjacent industrial estate road

Quartertown Lower Mallow Co. Cork.

573m
26/0945Grant with Conditions15 Apr 2026

The development will consist of (a) the construction of a single storey extension to the production area of Unit A on the North West Elevation, (b) first floor extension to the office area of Unit A and, (c) all associated site works.

Unit A, Clyda Business Park,, Quartertown Lower,, Mallow, Co. Cork, P51R858

601m
06/55085CONDITIONAL29 Nov 2006

Construction of an extension to existing building for light, industrial, warehouse. distribution use with office area and associated works.

Quartertown Ind Est Mallow Co Cork

607m
07/55018WITHDRAWN23 Mar 2007

Erection of Bulk Silo, Associated Tanks & Boiler, Concrete Yard at rear & side of building.

Quartertown Ind Est Mallow Co Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?