Proposed Development
Alterations to include a new 38kV GIS module, an extension to the existing control building and associated site works
Application Timeline
Application received
21 Jun 2010
Decision due
15 Aug 2010
Decision: CONDITIONAL
16 Aug 2010
Grant issued
17 Sept 2010
Application Details
- Location
- Carrigoon Beg Mallow
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 21 June 2010Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 16 August 2010
- Grant Date
- 17 September 2010
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Alterations to existing 110kV electrical transformer station to include installation of 2 no. 38kV/MV transformers and associated bunding, 1 no. oil/water interceptor and percolation area, 1 no. 38kV Transformer bay to include disconnects, circuit breakers, current transformers and cable sealing ends, new containerised medium voltage building and associated works
Carrigoon Beg Mallow
Alterations to existing ESB electrical transformer station to include installation of 2 no. 38kV/MV transformers and associated bunding, 1 no. oil/water interceptor and percolation area, 2 no. 38kV transformer bays to include disconnects, circuit breaker, voltage transformers, current transformers and surge arrestors, new containerised medium voltage buildings and associated civil works
Carrigoon Beg Mallow
Retention permission for a temporary portacabin including holding tank, which was retained on site used for staff welfare after the construction period, and permission for the demolition of this existing portacabin and construction of a new pre-fabricated portacabin, including holding tank, for use as staff welfare and all associated site works
ESB 110kV Substation St.Josephs Road Carrigoon beg Mallow, Co.Cork
Retention permission for a temporary portacabin including holding tank, which was retained on site used for staff welfare after the construction period, and permission for the demolition of this existing portacabin and construction of a new pre-fabricated portacabin, including holding tank, for use as staff welfare, and all associated site development works
ESB 110kV Substation, St.Joseph's Road Carrigoon Beg Mallow Co.Cork
Permission for Retention of a temporary portacabin including holding tank, which was retained on site used for staff welfare after the construction period, and Permission for the demolition of this existing portacabin and construction of a new pre-fabricated portacabin, including holding tank for use as staff welfare and all associated site development works.
ESB 110 kV Substation St. Josephs Road Carrigoon Beg Mallow, Co.Cork
Retention Permission for a temporary portacabin and permission for the demolition of a temporary portacabin and construction of a new pre-fabricated portacabin of 49s.q.m., and all associated site development works.
ESB 110kv Station St. Josephs Road Carrigoon Beg Mallow, Co. Cork
Retention of conversion of garage to bedroom, extensions to dwelling, semi open storage area, store and glasshouse for domestic use and detached domestic garage/office
Carrigoon Mallow
Construction of two-storey extension to south side of existing dwelling
Carrigoon Mallow
Permission for development to consist of the erection of 6 No. playing/training floodlights at the existing pitch, together with all associated works.
Keatleysclose, Mallow, Co. Cork
Permission for the construction of playing/training lights and all associated works
Parkadallane, Mallow, Cork, P51YP08
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?