Proposed Development
Permission for retention of existing domestic garage
Application Timeline
Application received
14 Sept 2012
Decision due
8 Nov 2012
Decision: CONDITIONAL
8 Nov 2012
Grant issued
12 Dec 2012
Application Details
- Location
- No. 3 Millbrook Mallow Co. Cork.
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 14 September 2012Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 8 November 2012
- Grant Date
- 12 December 2012
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of residential development of 6 no. residential units. The proposed development consists of the construction of 6 no. 3 bed semi detached dwellings. Vehicular access is proposed off Clyda Court to the north of the site. Permission is sought for the development outlined including, but not limited to, landscaping, boundary treatments, car parking and all ancillary site development works
off Clyda Court Quartertown Lower Mallow Co. Cork
Permission for manufacturing and storage warehouse facility and associated site works
I.D.A. Industrial Estate Quartertown Mallow Co. Cork.
Permission for the construction of 1 No. new light engineering high bay manufacturing & assembly workshop and 1 No. light engineering storage building adjacent to existing light engineering manufacturing buildings and all associated works.
Quartertown Industrial Estate Quartertown Lower Mallow Co. Cork
1) construction of warehouse building 2) extension of existing warehouse building and carrying out of all associated site works
Quartertown Ind Est Quartertown Lower Mallow Co. Cork.
Consturction of a toilet building within their existing allotment area adjacent to the Hi-Cone building as well as the laying of a new sewer through the Hi-Cone site to connect to the existing public sewer on the adjacent industrial estate road
Quartertown Lower Mallow Co. Cork.
To relocate an existing vehicular entrance ,onto the existing industrial estate road, from the west side of the site to the south side of the site, together with all associated site works
Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork, P51 XC7K
Permission for an additional vehicular entrance & driveway onto the existing industrial estate road to the south side of the existing premises, together with all associated site works.
Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork, P51 XC7K
Erection of Bulk Silo, Associated Tanks & Boiler, Concrete Yard at rear & side of building.
Quartertown Ind Est Mallow Co Cork
Construction of an extension to existing building for light, industrial, warehouse. distribution use with office area and associated works.
Quartertown Ind Est Mallow Co Cork
The development will consist of (a) the construction of a single storey extension to the production area of Unit A on the North West Elevation, (b) first floor extension to the office area of Unit A and, (c) all associated site works.
Unit A, Clyda Business Park,, Quartertown Lower,, Mallow, Co. Cork, P51R858