IDA Industrial Estate Quartertown Lower Mallow Co. Cork
INCOMPLETED APPLICATIONPlanning application 12/55017
Cork - Cork County Council
Proposed Development
Permission for a new manufacturing and warehouse facility with ancillary Plant and associated site works
Application Timeline
Application received
26 Oct 2012
Decision due
19 Feb 2013
Application Details
- Location
- IDA Industrial Estate Quartertown Lower Mallow Co. Cork.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 26 October 2012
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 19 February 2013
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for development consisting of a new manufacturing and warehouse facility with ancillary plant and associated site works. An Environmental Impact Statement will be submitted to the Planning Authority with the application. The application relates to development which comprises an activity requiring an integrated pollution control licence.
I.D.A. Industrial Estate Quartertown Lower Mallow Co. Cork.
construction of a storage yard, boundary fence and associated works
IDA Industrial Estate Quartertown Mallow Co. Cork.
to construct a 2004 sqm two-storey office building with ancillary use and to carry out all associated site works to include on site car parking
I.D.A. Industrial Estate Quartertown Lower Mallow
full planning permission for new developments at lands at Quartertown Lower, Mallow, Co. Cork. The proposed site is within the curtilage of Protected Structure RPS No. 00284 ( Quartertown Mills, Quartertown Lower). The development will consist of: 1) to construct 7 no. light industrial / warehouse units (Units 1 to 2 at Block A, Units 3 to 7 at Block B) with a gross total floor area of 2058.54sq.m, to be accessed via existing gated site entrance from shared access road serving the adjoining IDA Business and Technology Park 2) proposed alterations to and extension of existing internal access road and provision of new internal footpaths to serve new development 3) the development will also include construction of; 1no. ESB substation to serve development, car parking spaces including EV, accessible parking bays and visitor parking and bicycle parking shelters; covered bin storage areas; new boundary treatments; new signage on site; hard and soft landscaping, public lighting and all associated site development works above and below ground.
Quartertown Lower, Mallow, Co. Cork
Install a rooftop photovoltaic solar panel array consisting of approximately 280 square meters of solar panels on the eastern roof slope and approximately 808 square meters of solar panels on the western roof slope of the existing building.
Mallow Business and Technology Park Quartertown Lower Mallow Co. Cork
Construction of (1) new fabricating workshop (3200sqm) with attached two-storey office block and canteen area (1028sqm), (2) single storey ESB substation, (3) single storey stainless steel cleaning building, (4) 5X5m overground rainwater storage tank, and (5) all ancillary site works including on-site car park
Mallow Business & Technology Park Quartertown Lower Mallow
Change of use of a ground floor office production facility to a training area.
IDA Estate Quartertown Lower Mallow Co. Cork
Extension of an existing industrial building and alterations to existing elevations and floor plans. The works will comprise of (1) the extension of existing building, (2) alterations of existing elevations, (3) alterations to existing floor plans and (4) all associated site works.
IDA Business & Technology Park Quartertown Lower Mallow Cork, P51 DX59
Permission for the construction of a first floor extension onto side of dwelling
No. 4 Millbrook Heights, Mallow Co. Cork.
Permission for retention of existing domestic garage
No. 3 Millbrook Mallow Co. Cork.
The submission window has closed
Observations on this application closed on Thursday 29 November 2012, five weeks after it was received. The authority cannot accept a late submission.