Ard na Laoi Fair Street Mallow Co. Cork
CONDITIONALPlanning application 12/55023
Cork - Cork County Council
Proposed Development
Construction of 3 no. residential serviced sites, access road, alterations to existing site entrance and associated site services
View the full application file on the council's planning portal →Application Timeline
Application received
21 Dec 2012
Decision: CONDITIONAL
27 Aug 2013
Decision due
8 Sept 2013
Grant issued
1 Oct 2013
Application Details
- Location
- Ard na Laoi Fair Street Mallow Co. Cork.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 21 December 2012
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 27 August 2013
- Grant Date
- 1 October 2013
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The demolition of the existing ruined dwelling house, ancillary buildings and part of existing boundary walls and for the construction of 9 no. new dwelling houses consisting of 3 no. detached dwellings and 6no. semi-detached dwellings, the construction of parking and of a new entranceway serving the dwelling houses, and the carrying out of all associated site-works.
Ard Na Laoi Bathview Villas Mallow Co. Cork
The demolition of the existing ruined dwelling house, ancillary building and part of existing boundary walls and for the construction of 9 no. new dwelling houses consisting of 3 no. detached dwellings and 6 no. semi-detached dwellings, the construction of parking and of new entranceway serving the dwelling houses, and the carrying out of all associated site works.
Ard Na Laoi Bathview Villas Mallow Co Cork
change of use of an existing dwelling house to a medical centre including the refurbishment of the existing building and construction of a single storey extension, the construction of a mixed use building to include 13 no. units (6 no. apartments, 7 no. duplex's) 2 no. medical retail units, basement carpark and associated site works
Ard Na Laoi Fair Street Mallow Co. Cork.
construction of 2 no two-storey semi-detached dwellings
Fair Street Mallow Co. Cork.
Permission for redevelopement of the existing convent and former school building at Fair Street, Mallow. This redevelopment comprises (i) the refurbishment and conservtion repair of the convent building (ii) demolition of parts of the convent, namely the three storey north-west wing, the upper two floors of the north -east wing, the single storey sacristy area, outoffices and covered walk, (iii) the erection of a new three storey extension to the rear of the convent linked to the main building (iv) erection of new outoffices to comprise garden stores, clothes drying area and bin compound. In addition it is intended to redevelop the former school building to change it's use to residential accomodation comprising 4 no. single living apartment units. The works also comprise associated site works to include landscaping, car parking, provision of a new covered walk and amenity areas, provision of vehicular access to the bungalow at the main entrance from the private entrance drive to the convent together with connections to the existing drainage and water supply services. The convent building is listed as a protected structure in Mallow Town Council Development Plan.
Convent of Mercy Fair Street Mallow Co. Cork.
Permission for erection of Traffic Management Barrier
The Convent Primary School Bathview Mallow Co. Cork.
Retention of part two storey/part single storey extension to rear of existing two storey dwellinghouse
29 Glenanaar Row Mallow Co. Cork
Retention of part two storey /part single storey extension to rear of existing two storey dwellinghouse
29 Glenanaar Row Mallow Co. Cork
the following development consisting of (a) the construction of a 3 storey extension to existing post primary school, connected by new link covered walkway at first floor level. Total proposed development floor area is 2802 sqm, comprising of general classrooms, admin area, and supported education unit plus ancillary staff/student facilities with external student areas, access road, parking and drop off facilities. Development to include PV Panel installation at roof level, Heat Pump enclosure, LPG Tank enclosure. Overall site area is 2.06 Ha (b) removal of existing temporary classroom accommodation along with all related service, and reinstatement of staff car parking on vacated area , removal of temporary parking facilities to ballcourt area, 2 new accessible parking spaces (c) installation of 3 no. flag poles on concrete plinth to front of existing school to plus all associated site works
St. Mary's Secondary School, Mallow, Co. Cork, P51 PY04
the following development consisting of (a) the construction of a 3 storey extension to existing post primary school, connected by new link covered walkway at first floor level. Total proposed development floor area is 2802 sqm, comprising of general classrooms, admin area, and supported education unit plus ancillary staff/student facilities with external student areas, access road, parking and drop off facilities. Development to include PV Panel installation at roof level, Heat Pump enclosure, LPG Tank enclosure. Overall site area is 2.06 Ha (b) removal of existing temporary classroom accommodation along with all related service, and reinstatement of staff car parking on vacated area , removal of temporary parking facilities to ballcourt area, 2 new accessible parking spaces (c) installation of 3 no. flag poles on concrete plinth to front of existing school to plus all associated site works
St. Mary's Secondary School, Mallow, Co. Cork, P51 PY04
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?