North Harbour Cape Clear Island Co. Cork
INCOMPLETED APPLICATIONPlanning application 12/636
Cork - Cork County Council
Proposed Development
Construction of a slipway; demolition of the existing Bull's Nose structure at the outer end of the Breakwater Pier and its replacement with a new structure incorporating a storm gate and an extension to the end of Duffy's Pier; excavation, dredging and reclamation works including the construction of an armoured embankment at the seaward side of the new Bull's Nose structure and the reclamation of part of the Inner Basin to facilitate road widening and realignment, parking, lay down and landscaping works
Application Timeline
Application received
11 Oct 2012
Decision due
5 Dec 2012
Application Details
- Location
- North Harbour Cape Clear Island Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 11 October 2012
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 5 December 2012
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of rear extension & installation of 2 no. windows to bird observatory
BALLYIERAGH NORTH, BALLYIERAGH NORTH,
Chun talún a fhorbairt agus é a chur in oiriúint lena úsáid mar Chlós Spraí, chomh maith le gach cineál oibreacha coimhdeach a bhaineann leis. Development of land for use as a playground, as well as all associated works
Páirc Ghnó Údarás na Gaeltachta Baile Iarthach Thuaidh Oileán Chleire An Sciobairín, Contae Chorcaí
Dealbh adhmaid a chur in airde ag an laronad oidhreachta reatha ag Oilean Chleire, Co Choreal. San aireamh sna hoibreacha mollta beidh dealbh shnoite shaorsheasaimh adhmaid (timpeall 3.7m ar airde) a chur in airde, bonn treisithe coincreit a insealbhu agus na hoibreacha gaolmhara agus coimhdeacha suimh ar fad..
Baile Iarthach Thuaidh, Oileán Chléire, Sciobairín, Co. Chorcaí
Áireofar ar na hoibreacha atá beartaithe míonathraithe inmheánacha, tógáil síneadh de bhloc leithris (10.0m2), forsheomra iontrála gloinithe agus limistéar clúdaithe taobh amuigh, lánchóras cóireála fuiolluisce nua a chur in ionad an chórais cóireála fuíolluisce agus limistéar síothlaithe atá ann cheana, soláthar treochomharthaíochta bealaí, insealbhú múrphictiúr ballaí agus gach obair ghaolmhar. Tá Ráiteas Tionchair Natura (NIS) ullmhaithe agus beidh sé á chur ar aghaidh i dteannta an iarratais pleanála chuig an Údarás Pleanála
Aonad 1, Páirc Ghnó Údarás na Gaeltachta, Baile Iarthach Thuaidh, Oileán Chléire, Co. Chorcaí
Aireofar ar na hoibreacha ata beartaithe mionathraithe inmheanacha, togail sineadh de bhloc leithris 10.0m2 forsheomra iontrala gloinithe agus limistear cludaithe taobh amuigh, lanchoras coireala fuiolluisce nua a chur in ionad an chorais coireala fuiolluisce agus limistear siothlaithe ata ann cheana, solathar treochomharthaiochta bealai, insealbhu murphictiur ballai agus gach obair ghaolmhar
Aonad 1, Pairc Ghno Udaras na Gaeltachta, Baile Iarthach Thuaidh, Oilean Chleire, Co. Chorcai
Chun athrú úsáide agus athruithe bunúsacha agus athchóiriú ar aonad 2 a coinneáil, ó seomra an naíonra a chur in oiriúint lena úsáid mar GTeic, ó cheardlann go leagan amach le seomraí a chur in oiriúint lena úsáid mar oifig 1, oifig 2, seomra níochán, leabharlann poiblí, leithris, caintín, srl, agus athruithe ar chlaonna agus athruithe a cheangláitear a chomhlíonadh le rialacháin tógála, chomh maith le gach cineál oibreacha coimhdeach a bhaineann leis
Páirc Ghnó Údarás na Gaeltachta Baile Iarthach Thuaidh Oileán Chléire An Sciobairín Co. Chorcaí
Iarratas cead pleanála chun athruithe ábhartha a dhéanamh ar ingearchlónna seachtracha, oibreacha láithreáin agus leithris; chun athrú úsáide agus athruithe bunúsacha agus athchóiriú a choinneáil agus chríochnú chun seomra Naíonra a chur in oiriúint lena úsáid mar GTeic agus Stór Chartlanna chun seomra Ceardlanna a chur in oiriUint le leagan amach nua lena úsid mar Oifig 1 & Seomra Tae, Oifig 2, Seomra Níochán agus Leabharlann Poiblí; chun athruithe ar chlaonna a choinneáil; chun athruithe ábhartha chun na rialacháin tógála a chomhlíonadh a chríochnú agus ag cur san áireamh na hoibreacha coimhdeacha láithreáin ar fad ag Aonad 2 Ar Son Údarás na Gaeltachta. (Planning application for permission to make material alterations to external elevations, siteworks and toilets; for retention and completion of material alterations and changes of use from Naoinra to GTeic and Archive Store, from workshop to new layout with rooms for use as Office 1 & Tea Room, Office 2, Laundry and public Library; for retention of elevation changes; for completion of material alterations to comply with building regulations and incorporating all associated siteworks at Unit 2)
Páirc Ghnó Údarás Baile Iarthach Thuaidh Oileán Chléire An Sciobairín
Ionad forbartha a thógáil agus é a úsáid mar leabharlann phobli agus mar óifigi
Baile Iarthach Thuaidh Oileán Chléire An Sciobairin
A 65 metre long pontoon system and associated gangway, services and lighting; The pontoon system will be supported on steel bearing piles and will be used for marine leisure activities; A Nature Impact Statement will be submitted with the Application
North Harbour Cape Clear Co. Cork
A 65 metre long pontoon system and associated gangway, services and lighting. The pontoon system will be supported on steel bearing piles and will be used for marine leisure activities. A Nature Impact Statement will be submitted with the Application
North Harbour Cape Clear Co. Cork
The submission window has closed
Observations on this application closed on Wednesday 14 November 2012, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?