North Harbour Cape Clear Co. Cork
INCOMPLETED APPLICATIONPlanning application 16/298
Cork - Cork County Council
Proposed Development
A 65 metre long pontoon system and associated gangway, services and lighting. The pontoon system will be supported on steel bearing piles and will be used for marine leisure activities. A Nature Impact Statement will be submitted with the Application
Application Timeline
Application received
18 May 2016
Decision due
12 Jul 2016
Application Details
- Location
- North Harbour Cape Clear Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 18 May 2016
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 12 July 2016
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
A 65 metre long pontoon system and associated gangway, services and lighting; The pontoon system will be supported on steel bearing piles and will be used for marine leisure activities; A Nature Impact Statement will be submitted with the Application
North Harbour Cape Clear Co. Cork
Alterations to Duffy's Pier. The works will raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. Demolish an existing Control Building and construct a new Control building in its place to suit revised pier levels. The spine wall dividing the inner and outer basins will be altered locally so that the inner basin can continue to be closed off by stop logs in an emergency. The Planning Application will be accompanied by a Natura Impact Statement.
North Harbour Cape Clear Island Co. Cork
Alterations to Duffy's Pier. The works will raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. Permission is also being sought to demolish an existing Control Building and for the construction of new Control Building in its place to suit revised pier levels. The spine wall dividing the Inner and Outer Basins will be altered locally so that the Inner Basin can continue to be closed off by stop logs in an emergency. The Planning Application will be accompanied by a Natura Impact Statement
North Harbour Cape Clear Island Skibbereen Co. Cork
Alterations to Duffy's Pier. The works wiill raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. A control building on the pier will be raised to suit the revised pier levels
Duffy's Pier North Harbour Cape Clear Island Skibbereen, Co. Cork
Alterations to Duffy's Pier. The works will raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. A control building on the pier will be raised to suit the revised pier levels.
North Harbour Cape Clear Island Skibbereen Co. Cork
The development will consist of two plant rooms for operating the storm gates permitted by planning permission 12/00651. One of the plant rooms will be located on Duffys Pier, the other at the outer end of the breakwater pier will be the main control room for the operation of the storm gates
North Harbour Cape Clear Island
Construction of a slipway; demolition of the existing Bull's Nose structure at the outer end of the Breakwater Pier and its replacement with a new structure incorporating a storm gate and an extension to the end of Duffy's Pier; excavation, dredging and reclamation works including the construction of an armoured embankment at the seaward side of the new Bull's Nose structure and the reclamation of part of the Inner Basin to facilitate road widening and realignment, parking, lay down and landscaping works
North Harbour Cape Clear Island Co. Cork
Construction of a slipway; demolition of the existing Bull's Nose structure at the outer end of the Breakwater Pier and its replacement with a new structure incorporating a storm gate and an extension to the end of Duffy's Pier; excavation, dredging and reclamation works including the construction of an armoured embankment at the seaward side of the new Bull's Nose structure and the reclamation of part of the Inner Basin to facilitate road widening and realignment, parking, lay down and landscaping works
North Harbour Cape Clear Island Co. Cork
The development consists of two plant rooms for operating the storm gates permitted by Planning Permission 12/00651. One of the plant rooms will be located on Duffy's Pier, the other at the outer end of the Breakwater Pier will be the main Control Room for the operation of the Storm Gates
North Harbour Cape Clear Island Co. Cork
Construction of two plant rooms for operating the storm gates permitted by planning permission ref. 12/00651. One of the plant rooms will be located on Duffy's Pier, the other at the outer end of the breakwater pier will be the main control room for the operation of the storm gates
North Harbour Cape Clear Island Co. Cork
The submission window has closed
Observations on this application closed on Tuesday 21 June 2016, five weeks after it was received. The authority cannot accept a late submission.