North Harbour Cape Clear Island

WITHDRAWN

Planning application 14/535

Cork - Cork County Council

Proposed Development

The development will consist of two plant rooms for operating the storm gates permitted by planning permission 12/00651. One of the plant rooms will be located on Duffys Pier, the other at the outer end of the breakwater pier will be the main control room for the operation of the storm gates

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Sept 2014

  2. Decision due

    6 Nov 2014

Application Details

Location
North Harbour Cape Clear Island
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
12 September 2014
Status
WITHDRAWN
Decision
Pending
Decision Due
6 November 2014

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

24m
14/518INCOMPLETED APPLICATION5 Sept 2014

The development consists of two plant rooms for operating the storm gates permitted by Planning Permission 12/00651. One of the plant rooms will be located on Duffy's Pier, the other at the outer end of the Breakwater Pier will be the main Control Room for the operation of the Storm Gates

North Harbour Cape Clear Island Co. Cork

24m
14/582CONDITIONAL9 Oct 2014

Construction of two plant rooms for operating the storm gates permitted by planning permission ref. 12/00651. One of the plant rooms will be located on Duffy's Pier, the other at the outer end of the breakwater pier will be the main control room for the operation of the storm gates

North Harbour Cape Clear Island Co. Cork

41m
17/402INCOMPLETED APPLICATION28 Jun 2017

Alterations to Duffy's Pier. The works will raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. Demolish an existing Control Building and construct a new Control building in its place to suit revised pier levels. The spine wall dividing the inner and outer basins will be altered locally so that the inner basin can continue to be closed off by stop logs in an emergency. The Planning Application will be accompanied by a Natura Impact Statement.

North Harbour Cape Clear Island Co. Cork

41m
17/455CONDITIONAL11 Jul 2017

Alterations to Duffy's Pier. The works will raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. Permission is also being sought to demolish an existing Control Building and for the construction of new Control Building in its place to suit revised pier levels. The spine wall dividing the Inner and Outer Basins will be altered locally so that the Inner Basin can continue to be closed off by stop logs in an emergency. The Planning Application will be accompanied by a Natura Impact Statement

North Harbour Cape Clear Island Skibbereen Co. Cork

41m
22/56INCOMPLETED APPLICATION4 Feb 2022

Alterations to Duffy's Pier. The works wiill raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. A control building on the pier will be raised to suit the revised pier levels

Duffy's Pier North Harbour Cape Clear Island Skibbereen, Co. Cork

41m
17/331INCOMPLETED APPLICATION26 May 2017

Alterations to Duffy's Pier. The works will raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. A control building on the pier will be raised to suit the revised pier levels.

North Harbour Cape Clear Island Skibbereen Co. Cork

44m
12/651CONDITIONAL18 Oct 2012

Construction of a slipway; demolition of the existing Bull's Nose structure at the outer end of the Breakwater Pier and its replacement with a new structure incorporating a storm gate and an extension to the end of Duffy's Pier; excavation, dredging and reclamation works including the construction of an armoured embankment at the seaward side of the new Bull's Nose structure and the reclamation of part of the Inner Basin to facilitate road widening and realignment, parking, lay down and landscaping works

North Harbour Cape Clear Island Co. Cork

53m
16/340CONDITIONAL1 Jun 2016

A 65 metre long pontoon system and associated gangway, services and lighting; The pontoon system will be supported on steel bearing piles and will be used for marine leisure activities; A Nature Impact Statement will be submitted with the Application

North Harbour Cape Clear Co. Cork

53m
16/298INCOMPLETED APPLICATION18 May 2016

A 65 metre long pontoon system and associated gangway, services and lighting. The pontoon system will be supported on steel bearing piles and will be used for marine leisure activities. A Nature Impact Statement will be submitted with the Application

North Harbour Cape Clear Co. Cork

103m
12/636INCOMPLETED APPLICATION11 Oct 2012

Construction of a slipway; demolition of the existing Bull's Nose structure at the outer end of the Breakwater Pier and its replacement with a new structure incorporating a storm gate and an extension to the end of Duffy's Pier; excavation, dredging and reclamation works including the construction of an armoured embankment at the seaward side of the new Bull's Nose structure and the reclamation of part of the Inner Basin to facilitate road widening and realignment, parking, lay down and landscaping works

North Harbour Cape Clear Island Co. Cork

The submission window has closed

Observations on this application closed on Thursday 16 October 2014, five weeks after it was received. The authority cannot accept a late submission.