Quartertown Industrial Estate Ballydahin Mallow Co. Cork
CONDITIONALPlanning application 13/55010
Cork - Cork County Council
Proposed Development
Permission to accept domestic waste and the installation of associated equipment at Mallow Civic Amenity site
Application Timeline
Application received
5 Apr 2013
Decision due
30 May 2013
Decision: CONDITIONAL
30 May 2013
Grant issued
3 Jul 2013
Application Details
- Location
- Quartertown Industrial Estate Ballydahin Mallow Co. Cork.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 5 April 2013
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 30 May 2013
- Grant Date
- 3 July 2013
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of a Civic Amenity Site
Quartertown Ind Estate Quartertown Mallow Co. Cork.
Permission for manufacturing and storage warehouse facility and associated site works
I.D.A. Industrial Estate Quartertown Mallow Co. Cork.
to construct a 2004 sqm two-storey office building with ancillary use and to carry out all associated site works to include on site car parking
I.D.A. Industrial Estate Quartertown Lower Mallow
Erection of Bulk Silo, Associated Tanks & Boiler, Concrete Yard at rear & side of building.
Quartertown Ind Est Mallow Co Cork
Change of use of a ground floor office production facility to a training area.
IDA Estate Quartertown Lower Mallow Co. Cork
Install a rooftop photovoltaic solar panel array consisting of approximately 280 square meters of solar panels on the eastern roof slope and approximately 808 square meters of solar panels on the western roof slope of the existing building.
Mallow Business and Technology Park Quartertown Lower Mallow Co. Cork
Construction of (1) new fabricating workshop (3200sqm) with attached two-storey office block and canteen area (1028sqm), (2) single storey ESB substation, (3) single storey stainless steel cleaning building, (4) 5X5m overground rainwater storage tank, and (5) all ancillary site works including on-site car park
Mallow Business & Technology Park Quartertown Lower Mallow
proposed development consists of alterations and an extension to the two-storey offices/single storey storage building (building 1), construction of a new single storey storage building (building 6), and associated siteworks (serving buildings 1 & 6)
Quartertown Ind. Estate Mallow Co. Cork.
Permission for the construction of 1 No. new light engineering high bay manufacturing & assembly workshop and 1 No. light engineering storage building adjacent to existing light engineering manufacturing buildings and all associated works.
Quartertown Industrial Estate Quartertown Lower Mallow Co. Cork
Extension of an existing industrial building and alterations to existing elevations and floor plans. The works will comprise of (1) the extension of existing building, (2) alterations of existing elevations, (3) alterations to existing floor plans and (4) all associated site works.
IDA Business & Technology Park Quartertown Lower Mallow Cork, P51 DX59
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?