Quartertown Industrial Estate Ballydahin Mallow Co. Cork

CONDITIONAL

Planning application 13/55010

Cork - Cork County Council

Proposed Development

Permission to accept domestic waste and the installation of associated equipment at Mallow Civic Amenity site

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Apr 2013

  2. Decision due

    30 May 2013

  3. Decision: CONDITIONAL

    30 May 2013

  4. Grant issued

    3 Jul 2013

Application Details

Location
Quartertown Industrial Estate Ballydahin Mallow Co. Cork.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
5 April 2013
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
30 May 2013
Grant Date
3 July 2013

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
05/55004NEW APPLICATION18 Jan 2005

Construction of a Civic Amenity Site

Quartertown Ind Estate Quartertown Mallow Co. Cork.

164m
08/55029CONDITIONAL19 May 2008

Permission for manufacturing and storage warehouse facility and associated site works

I.D.A. Industrial Estate Quartertown Mallow Co. Cork.

183m
05/55094CONDITIONAL12 Dec 2005

to construct a 2004 sqm two-storey office building with ancillary use and to carry out all associated site works to include on site car parking

I.D.A. Industrial Estate Quartertown Lower Mallow

195m
07/55018WITHDRAWN23 Mar 2007

Erection of Bulk Silo, Associated Tanks & Boiler, Concrete Yard at rear & side of building.

Quartertown Ind Est Mallow Co Cork

198m
05/55044CONDITIONAL29 Jun 2005

Change of use of a ground floor office production facility to a training area.

IDA Estate Quartertown Lower Mallow Co. Cork

230m
21/5573CONDITIONAL4 Jun 2021

Install a rooftop photovoltaic solar panel array consisting of approximately 280 square meters of solar panels on the eastern roof slope and approximately 808 square meters of solar panels on the western roof slope of the existing building.

Mallow Business and Technology Park Quartertown Lower Mallow Co. Cork

230m
15/4690CONDITIONAL8 Apr 2015

Construction of (1) new fabricating workshop (3200sqm) with attached two-storey office block and canteen area (1028sqm), (2) single storey ESB substation, (3) single storey stainless steel cleaning building, (4) 5X5m overground rainwater storage tank, and (5) all ancillary site works including on-site car park

Mallow Business & Technology Park Quartertown Lower Mallow

233m
08/55056CONDITIONAL24 Jul 2008

proposed development consists of alterations and an extension to the two-storey offices/single storey storage building (building 1), construction of a new single storey storage building (building 6), and associated siteworks (serving buildings 1 & 6)

Quartertown Ind. Estate Mallow Co. Cork.

236m
24/6514CONDITIONAL23 Dec 2024

Permission for the construction of 1 No. new light engineering high bay manufacturing & assembly workshop and 1 No. light engineering storage building adjacent to existing light engineering manufacturing buildings and all associated works.

Quartertown Industrial Estate Quartertown Lower Mallow Co. Cork

259m
18/5099CONDITIONAL2 May 2018

Extension of an existing industrial building and alterations to existing elevations and floor plans. The works will comprise of (1) the extension of existing building, (2) alterations of existing elevations, (3) alterations to existing floor plans and (4) all associated site works.

IDA Business & Technology Park Quartertown Lower Mallow Cork, P51 DX59

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?