Ballybeg Newtwopothouse Mallow Co.Cork

CONDITIONAL

Planning application 13/5658

Cork - Cork County Council

Proposed Development

Demolition of existing cottage and construction of dwelling incorporating existing extension of demolished cottage and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Aug 2013

  2. Decision: CONDITIONAL

    6 Dec 2013

  3. Decision due

    19 Dec 2013

  4. Grant issued

    20 Jan 2014

Application Details

Location
Ballybeg Newtwopothouse Mallow Co.Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
27 August 2013Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
6 December 2013
Grant Date
20 January 2014

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

395m
08/8509CONDITIONAL21 Aug 2008

Construction of 2 no. light industrial/display showroom buildings, each building comprising of two separate units, ESB substation, new boundaryr treatment works, attenuation tanks and associated site development works

M20 Business Park Ballybeg Newtwopothouse Limerick Road

423m
21/5074REFUSED23 Apr 2021

Development of agricultural land and construction of six dwellings complete with all associated site works including installation of septic tanks and percolation areas, access road and alteration works to improve the existing domestic and field access.

Ballybeg New Twopothouse Mallow Co. Cork

441m
08/8722INCOMPLETED APPLICATION3 Sept 2008

Dwellinghouse, garage & septic tank

Ballybeg Buttevant

531m
07/8737INCOMPLETED APPLICATION15 Jun 2007

Extension to existing light industrial, warehousing and distribution facility to include the demolition of 1 no. building and refurbishment of existing warehouse to provide 13 no. light industrial units

Newtwopothouse Ballybeg Limerick Rd Mallow

531m
08/5548CONDITIONAL19 Mar 2008

Alterations to site boundaries and relocation of treatment unit previously permitted under Planning Reg. No. 07/9991 and construction of substation

Ballybeg Newtwopothouse Limerick Rd Mallow

539m
07/9991CONDITIONAL31 Jul 2007

Extension to existing light industrial warehouse and distribution facility to include demolition of one building, extensions to existing building and refurbishment and change of use of second warehouse building to create 13 no. light industrial units, alterations to entrance, construction of retaining wall, water storage tanks and installation of treatment unit to replace existing septic tanks

Ballybeg Newtwopothouse Limerick Rd Mallow

539m
07/9548INCOMPLETED APPLICATION12 Jul 2007

Demolition of building and construction of extensions to existing light industrial warehousing and distribution facility and refurbishment and change of use of second warehouse building to provide 13 no. light industrial units, alterations to entrance, construction of retaining wall, water storage tanks and installation of treatment unit to replace existing septic tanks

Newtwopothouse Ballybeg Limerick Rd Mallow

542m
08/9683CONDITIONAL14 Nov 2008

Dwellinghouse, domestic garage/store and installation of septic tank

Ballybeg Buttevant

554m
25/4854Conditional Permission7 May 2025

Permission to construct a new 520m2 single storey loading dock extension onto an existing light industrial/warehouse distribution building to serve the existing supply chain business. The development will include a minor alteration to the existing northern boundary along with: a) The addition of 9 no. lorry dock levelers onto the rear of the proposed extension with canopy. b) Demolition and relocation of the existing graded ramp from the existing rear elevation onto the side elevation of the proposed extension with canopy over. c) Addition of 3 no. lorry dock levelers onto the rear elevation and all associated site development works including site lighting, site drainage systems, SUDS and landscaping works.

Masterlink Logistics Ltd Newtwopothouse Ballybeg Mallow Co Cork P51 X952

554m
25/4378INCOMPLETED APPLICATION6 Mar 2025

Permission to construct a new 520m² single-storey loading dock extension onto an existing light industrial/warehouse distribution building to serve the existing supply chain business. The development will include (a) The addition of 9no. lorry dock levellers onto the rear of the proposed extension with canopy, (b) Demolition and relocation of the existing graded ramp from the existing rear elevation onto the side elevation of the proposed extension with canopy over, (c) Addition of 3no.lorry dock levellers onto the existing rear elevation and all associated site development works including site lighting, site drainage systems, SUDS and landscaping works.

Masterlink Logistics Ltd Newtwopothouse Mallow Co. Cork P51X952

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?