Proposed Development
The site comprises an existing quarry of 15.5 ha approximately (plus an additional 0.36 ha overburden, approximately) and 2 no. adjacent pieces of land of 4.06 ha and 0.53 ha, approximately. The existing quarry is permitted to a depth of 0m OD and includes an asphalt plant and associated facilities (Cork County Council Planning Reg. No. S/02/5476 ; An Bord Pleanála Ref. No. PL04.203762). The proposed development will consist of: the deepening of the existing permitted limestone, sand and gravel quarry by 20 metres (i.e. 1 no. extractive bench from 0m OD to – 20m OD), which will extend the existing quarry below the water table level and extend the life of the quarry by approximately 15 no. years; the provision of an infiltration pond system for managing the groundwater generated (including 1 no. attenuation pond, 2 no. settlement lagoons [phased provision], and 1 no. infiltration pond, together with maintenance access road and perimeter fencing); a westward realignment of the existing private access road adjoining the site to form a new entrance onto the east-west public road to the north (LP3619-0) providing a staggered junction at this location with new visibility splay; the provision of a revised access point to the public road for the existing residential property where the existing private road currently joins the public road; and the waiving of Condition No. 2 of An Bord pleanála Ref. No. PL04.203762 (Planning Reg. No. S/02/5476), to allow for the continuance of use of the quarry together with the asphalt plant and ancillary site works as permitted. The proposed development will not result in any increase in either the permitted area of the existing quarry void or the permitted output rate of the existing quarry, which is proposed to be maintained at a rate of 250,000 tonnes per annum. The proposed development will utilize the existing on-site haul road from the site entrance adjacent to the asphalt plant and proceed one-way around the south/west of the lagoon to a proposed two-way haulage ramp, which will extend from the southern boundary of the proposed extractive area. Traffic is proposed to exit from here one-way via the north/east of the lagoon towards the site exit. The proposed development will also include landscaping, reduced screening berms to a minimum of 5 metres high at the northern boundary, and all other site development works above and below ground, including a new restoration plan for the final quarry void.
Application Timeline
Application received
6 Dec 2013
Decision due
10 Oct 2015
Application Details
- Location
- Rossmore Carrigtwohill Co Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 6 December 2013Other applications received that week
- Status
- WITHDRAWN
- Decision
- Pending
- Decision Due
- 10 October 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development consists of the continued use of the existing asphalt plant, the existing storage shed (837 sq. metres), and associated infrastructure and structures permitted under P. Ref. S/02/5476 (ABP Ref. PL04.203762); P. Ref. 14/04061; and P. Ref. 14/06489 (ABP Ref. PL04.244651) within an application area of 1.605 Hectares.
Rossmore Carrigtwohill Co. Cork
An increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under Planning Reg. Nos. 18/06874, 19/5050 and 20/04589), from 100 no. days per annum to 150 no. days per annum, within an application area of 1.605 Hectares. The proposed development will not result in any change in current output rates.
Rossmore Carrigtwohill Co. Cork
The development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref’s 18/06874 and 19/5050), from 60 no. days per annum to 100 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.
Rossmore Carrigtwohill Co. Cork
Development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref. 18/6874), from 40 no. days per annum to 60 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.
Rossmore Carrigtwohill Co. Cork
The application site comprises an existing asphalt plant (permitted as part of overall quarry development under Cork County Council Planning Ref. No. 02/5476, and An Bórd Pleanála Ref. No. PL04.203762) The proposed development seeks to provide for the extension of opening hours of asphalt plant to allow operations on site between 0600 hours and 1900 hours Mondays to Fridays and between 0700 hours and 1600 hours on Saturdays; occasional operations outside of normal working hours up to a maximum of 40no. days per annum. The proposed development will not result in any increase in the permitted output rate of existing quarry, which will be maintained at a rate of 250000 tonnes per annum
Rossmore Carrigtwohill Co.Cork
Dwelling
ROSSMORE, ROSSMORE,
Construction of vehicular entrance to service and maintain septic tank serving existing dwelling
The Bungalow Rossmore Carrigtwohill
Permission for: 1) Provision of a 10,526 square metre defined recycling area in the quarry floor, 2) Processing of up to 19,500 tonnes of waste concrete annually using a mobile crushing and screening plant, 3) Stock piling of waste concrete prior to processing and 4) Stockpiling of recycled aggregates prior to transport off-site for use in construction works.
Barryscourt and Rossmore Carrigtwohill Co Cork
Permission for: 1) Provision of a 10,526 square metre defined recycling area in the pit floor, 2) Processing of up to 19,500 tonnes of waste concrete annually using a mobile crushing and screening plant, 3) Stock piling of waste concrete prior to processing and 4) Stockpiling of recycled aggregates prior to transport off-site for use in construction works.
Barryscourt TD and Rossmore TD Carrigtwohill Co. Cork
Permission for:- (1) Provision of a 10,526 square metre defined recycling area in the pit floor (2) Processing of up to 19,500 tonnes of waste concrete annually using a mobile crushing and screening plant (3) Stockpiling of waste concrete prior to processing and (4) Stockpiling of recycled aggregates prior to transport off-site for use in construction work.
Barryscourt & Rossmore Carrigtwohill Co Cork
The submission window has closed
Observations on this application closed on Saturday 18 January 2014, five weeks after it was received. The authority cannot accept a late submission.