← Back to search

Strand Street Kanturk Co.Cork

INCOMPLETED APPLICATION

Planning application 14/4685

Cork - Cork County Council

Proposed Development

Site improvement works consisting of

  1. (a)
    Construction of a new footpath & kerbing
  2. (b)
    Creation of 2no. formalised entrances
  3. (c)
    Erection of bollards,
  4. (d)
    all associated site works.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Apr 2014

  2. Decision due

    29 May 2014

Application Details

Location
Strand Street Kanturk Co.Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
4 April 2014
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
29 May 2014

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
14/4717CONDITIONAL9 Apr 2014

Site improvement works consisting of: [a] construction of a new footpath and kerbing, [b] creation of 2 formalised entrances, [c] erection of bollards, and [d] all associated site works

Strand Street Kanturk

11m
16/6769INCOMPLETED APPLICATION4 Nov 2016

Construction of extension and improvements to site boundary in the form of a new footpath and removable bollards. The building extension will serve as an extension to cold storage facilities and as an improved facility for product dispatch operations. The new extension will cover the existing office block building and will hide dispatch operations from the public eye. The building extension and associated works will comprise of (1) a new loading dock building with four roller shutter doors and staff access door via external stairs (2) one low level retaining wall with protection rail, (3) a new concrete paved open yard with declining ramp from footpath to building, (4) two kerbs alongside declining ramps, (5) a new pedestrian footpath at road interface, (6) removable bollards between footpath and yard, (7) one petrol interceptor for surface water cleansing and (8) all associated site works.

Strand Street Kanturk Co. Cork

11m
16/7019CONDITIONAL5 Dec 2016

Construction of extension and improvements to site boundary in the form of a new footpath and removable bollards. The building extension will serve as an extension to cold storage facilities and as an improved facility for product dispatch operations. The new extension will cover the existing office block building and will hide dispatch operations from the public eye. The building extension and associated works will comprise of (1) a new loading dock building with four roller shutter doors and staff access door via external stairs (2) one low level retaining wall with protection rail, (3) a new concrete paved open yard with declining ramp from footpath to building, (4) two kerbs alongside declining ramps, (5) a new pedestrian footpath at road interface, (6) removable bollards between footpath and yard, (7) one petrol interceptor for surface water cleansing and (8) all associated site works. A Natura Impact Statement will be submitted to the Planning Authority with the application.

Strand Street Kanturk Co. Cork

14m
09/8082CONDITIONAL23 Dec 2009

Construction of extension and alterations to existing bottling plant

Strand Street Kanturk

36m
18/4773REFUSED29 Mar 2018

Demolition of an existing single storey dwellinghouse and to construct a two storey building comprising of a ground floor retail unit and first floor 2 bed apartment with car parking to the rear including all ancillary works

Bluepool Lower Kanturk Co. Cork

40m
06/4631CONDITIONAL8 Feb 2006

Change of use of dwelling to retail unit on ground floor and apartment on first floor and alterations to same including pedestrian access and construction of 2 no. retail units and bin store to rear

Strand St Kanturk

55m
04/2293CONDITIONAL7 Apr 2004

Covered bus shelter

Bluepool Upper Kanturk

56m
05/4904CONDITIONAL11 Jul 2005

Alterations, ground floor and first floor extensions and change of use of dwelling to 2 no. commercial units (retail and auctioneering) on ground floor with associated signage and 1 no. apartment overhead

Strand St Kanturk

57m
14/6182CONDITIONAL10 Oct 2014

Retention of alteration to entrance consisting of removal of existing stone wall and entrance and their replacement with new piers and entrance gate

Strand Street Kanturk Co.Cork

57m
13/6407WITHDRAWN18 Dec 2013

Retention of alterations to entrance consisting of removal of existing stone wall and entrance and their replacement with new piers and entrance gate

Strand Street Kanturk Co Cork

The submission window has closed

Observations on this application closed on Thursday 8 May 2014, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?