North Harbour Cape Clear Island
INCOMPLETED APPLICATIONPlanning application 14/746
Cork - Cork County Council
Proposed Development
Remedial works to the south western end of Duffys Pier. The works will comprise of pier widening and strengthening works and will include filling, sheet piling, masonry, reinforced concrete and asociated works
Application Timeline
Application received
23 Dec 2014
Decision due
25 Feb 2015
Application Details
- Location
- North Harbour Cape Clear Island
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 23 December 2014
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 25 February 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Remedial works to the south western end of Duffy's Pier. The works will comprise of pier widening and strengthening works and will include filling, sheet piling, masonry, reinforced concrete and associated works. A Natura Impact Statement has been prepared and will be submitted with this application
North Harbour Cape Clear Island
Alterations to Duffy's Pier. The works will raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. Demolish an existing Control Building and construct a new Control building in its place to suit revised pier levels. The spine wall dividing the inner and outer basins will be altered locally so that the inner basin can continue to be closed off by stop logs in an emergency. The Planning Application will be accompanied by a Natura Impact Statement.
North Harbour Cape Clear Island Co. Cork
Alterations to Duffy's Pier. The works will raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. Permission is also being sought to demolish an existing Control Building and for the construction of new Control Building in its place to suit revised pier levels. The spine wall dividing the Inner and Outer Basins will be altered locally so that the Inner Basin can continue to be closed off by stop logs in an emergency. The Planning Application will be accompanied by a Natura Impact Statement
North Harbour Cape Clear Island Skibbereen Co. Cork
Alterations to Duffy's Pier. The works wiill raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. A control building on the pier will be raised to suit the revised pier levels
Duffy's Pier North Harbour Cape Clear Island Skibbereen, Co. Cork
Alterations to Duffy's Pier. The works will raise, widen and strengthen the pier and will include filling, sheet piling, reinforced concrete and associated works. A control building on the pier will be raised to suit the revised pier levels.
North Harbour Cape Clear Island Skibbereen Co. Cork
A 65 metre long pontoon system and associated gangway, services and lighting; The pontoon system will be supported on steel bearing piles and will be used for marine leisure activities; A Nature Impact Statement will be submitted with the Application
North Harbour Cape Clear Co. Cork
A 65 metre long pontoon system and associated gangway, services and lighting. The pontoon system will be supported on steel bearing piles and will be used for marine leisure activities. A Nature Impact Statement will be submitted with the Application
North Harbour Cape Clear Co. Cork
Dealbh adhmaid a chur in airde ag an laronad oidhreachta reatha ag Oilean Chleire, Co Choreal. San aireamh sna hoibreacha mollta beidh dealbh shnoite shaorsheasaimh adhmaid (timpeall 3.7m ar airde) a chur in airde, bonn treisithe coincreit a insealbhu agus na hoibreacha gaolmhara agus coimhdeacha suimh ar fad..
Baile Iarthach Thuaidh, Oileán Chléire, Sciobairín, Co. Chorcaí
chun seid nua a thogáil agus é a chur in oiriúint lena úsáid mar seid dhlúthadóiur agus le haghaidh burlaí ábhair in-athchúrsáilte a stóráil, chomh maith le gach cineál oibreacha coímdeach a bhaineann leis. For construction of new shed for use as a compactor shed and for storage of bale of recyclable materials, as well as all associated works.
Páirc Ghnó Údarás na Gaeltachta Baile Iarthach Thuaidh Oileán Chléire, An Sciobairin
chun athruithe ábhartha ar na hingearchlónna, ballaí agus díon an tseid a fuair cead pleanála Uimhir 22/719, le hagaidh dhlúthadóiur agus ábhair in-athchúrsáilte a stóráil chomh maith le gach cineál oibreacha coimhdeach a bhaineann leis. Material alterations to the elevations, walls and roof of shed granted planning permission Number 22/719, for a compactor and storage of bales of recyclable materials, as well as all associated works
Páirc Ghnó Údarás na Gaeltachta Baile Iarthach Thuaidh Oileán Chléire An Sciobairín
The submission window has closed
Observations on this application closed on Wednesday 4 February 2015, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?