← Back to search

Blind Harbour Reen Union Hall Co. Cork

UNCONDITIONAL

Planning application 15/126

Cork - Cork County Council

Proposed Development

Retention for construction of slipway and alteration to outdoor swimming pool

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Mar 2015

  2. Decision: UNCONDITIONAL

    11 Aug 2015

  3. Decision due

    13 Aug 2015

  4. Grant issued

    16 Sept 2015

Application Details

Location
Blind Harbour Reen Union Hall Co. Cork
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
12 March 2015Other applications received that week
Status
APPLICATION FINALISED
Decision
UNCONDITIONAL
Decision Date
11 August 2015
Grant Date
16 September 2015

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
15/59INCOMPLETED APPLICATION13 Feb 2015

Retention Permission for construction of slipway and alteration to outdoor swimming pool

Blind Harbour Reen Union Hall Co. Cork

22m
22/625CONDITIONAL6 Oct 2022

Permission for the following works to house / property : (i) Proposed balcony extension to house, (ii) alteration to roof, (iii) relocation of entrance to side of house, (iv) construction of sheltered open storage area to rear, (v) removal of porch and of unauthorized conservatory, (vi) fenestration changes to house, (vii) decommission / infill of external swimming pool, (viii) installation of replacement waste water system, (ix) retention of existing domestic garage and (x) all associated site works

'Blind Harbour House' Blind Harbour Reen, Union Hall Co. Cork

216m
00/5173CONDITIONAL25 Aug 2000

Dwelling & garage/storage loft

REEN, REEN,

426m
16/205CONDITIONAL7 Apr 2016

For structures for; 1. An office and gear changing rooms connected to 2. a Gear Drying Storeroom with 3. A pergola type shelter porch, 4. A Boat House for the storage of kayaks together with 5. A Kayak and pedestrian access to Reen Pier and 6. A two vehicle parking and turning bay from the road above together with associated site works

Reen Pier Reen Union Hall Co. Cork

426m
16/179INCOMPLETED APPLICATION29 Mar 2016

For structures for; 1. An office and gear changing rooms connected to 2. a Gear Drying Storeroom with 3. A pergola type shelter porch, 4. A Boat House for the storage of kayaks together with 5. A Kayak and pedestrian access to Reen Pier and 6. A two vehicle parking and turning bay from the road above together with associated site works

Reen Pier Reen Union Hall Co. Cork

461m
08/2001CONDITIONAL7 Nov 2008

Retention of cliff retaining wall

Reen Union Hall

462m
13/408CONDITIONAL11 Jul 2013

Permission for (1) Retention of semi detached office/store and for carrying out of alterations and extension therto, (2) construction of replacement conservatory extension on west elevation, (3) construction of part 2 storey and part single storey extension on east elevation, (4) construction of detached garden shed/store and associated site development works

Reen Union Hall Co. Cork

515m
20/561CONDITIONAL12 Oct 2020

Alterations to existing boathouse including the relocation of the entrance and raising of the level of the roof

Raheen Union Hall Co. Cork

590m
02/1511CONDITIONAL19 Apr 2002

Dwelling

REEN, REEN,

595m
01/6411CONDITIONAL26 Nov 2001

Extension to dwellinghouse

RAHEEN, RAHEEN,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?