Blind Harbour Reen Union Hall Co. Cork
INCOMPLETED APPLICATIONPlanning application 15/59
Cork - Cork County Council
Proposed Development
Retention Permission for construction of slipway and alteration to outdoor swimming pool
Application Timeline
Application received
13 Feb 2015
Decision due
9 Apr 2015
Application Details
- Location
- Blind Harbour Reen Union Hall Co. Cork
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 13 February 2015Other applications received that week
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 9 April 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention for construction of slipway and alteration to outdoor swimming pool
Blind Harbour Reen Union Hall Co. Cork
Permission for the following works to house / property : (i) Proposed balcony extension to house, (ii) alteration to roof, (iii) relocation of entrance to side of house, (iv) construction of sheltered open storage area to rear, (v) removal of porch and of unauthorized conservatory, (vi) fenestration changes to house, (vii) decommission / infill of external swimming pool, (viii) installation of replacement waste water system, (ix) retention of existing domestic garage and (x) all associated site works
'Blind Harbour House' Blind Harbour Reen, Union Hall Co. Cork
Dwelling & garage/storage loft
REEN, REEN,
For structures for; 1. An office and gear changing rooms connected to 2. a Gear Drying Storeroom with 3. A pergola type shelter porch, 4. A Boat House for the storage of kayaks together with 5. A Kayak and pedestrian access to Reen Pier and 6. A two vehicle parking and turning bay from the road above together with associated site works
Reen Pier Reen Union Hall Co. Cork
For structures for; 1. An office and gear changing rooms connected to 2. a Gear Drying Storeroom with 3. A pergola type shelter porch, 4. A Boat House for the storage of kayaks together with 5. A Kayak and pedestrian access to Reen Pier and 6. A two vehicle parking and turning bay from the road above together with associated site works
Reen Pier Reen Union Hall Co. Cork
Retention of cliff retaining wall
Reen Union Hall
Permission for (1) Retention of semi detached office/store and for carrying out of alterations and extension therto, (2) construction of replacement conservatory extension on west elevation, (3) construction of part 2 storey and part single storey extension on east elevation, (4) construction of detached garden shed/store and associated site development works
Reen Union Hall Co. Cork
Alterations to existing boathouse including the relocation of the entrance and raising of the level of the roof
Raheen Union Hall Co. Cork
Dwelling
REEN, REEN,
Extension to dwellinghouse
RAHEEN, RAHEEN,
The submission window has closed
Observations on this application closed on Thursday 19 March 2015, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?