← Back to search

18 The Spires Carrignafoy Cobh Co. Cork

CONDITIONAL

Planning application 15/6875

Cork - Cork County Council

Proposed Development

  1. (a)
    Construction of a single storey kitchen extension and installation of 2 no. rooflights to the ground floor dining room at the rear (north) of dwelling house together with a new external side door to the ground floor utility room
  2. (b)
    construction of a first floor extension to the side (east) incorporating part use of the attic space as a walk-in wardrobe with a rooflight to the front (south)
  3. (c)
    conversion of existing attic space to provide bedroom and en-suite accommodation with a dormer window and rooflight to both the front and rear, together with all associated alterations and site works
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Dec 2015

  2. Decision: CONDITIONAL

    17 Feb 2016

  3. Decision due

    19 Feb 2016

  4. Grant issued

    5 Apr 2016

Application Details

Location
18 The Spires Carrignafoy Cobh Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
17 December 2015
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 February 2016
Grant Date
5 April 2016

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

34m
11/5476INCOMPLETED APPLICATION8 Jul 2011

Construction of ground floor side extension, first floor extension and all associated site works

112 The Spires Carrignafoy Cobh

34m
11/5591CONDITIONAL22 Jul 2011

Construction of ground floor side extension, first floor extension to dwellinghouse and all associated site works

112 The Spires Carrignafoy Cobh

34m
25/5326Conditional Permission4 Jul 2025

A) Permission to construct a single storey extension to the front (West) elevation, B) Retention Permission for the as built existing single storey rear extension (37.9m²). *Note: Rear extension was previously granted Permission under PL. Reg. No. 21/05915, but this existing extension at the time was built bigger, the parapet overhang was revised and some ope revisions to the rear and side (South) elevations of existing dwelling.

No.112 The Spires Carrignafoy Cobh Co. Cork

34m
21/5915CONDITIONAL9 Jul 2021

i) Removal of hipped roof over existing rear single storey annex, ii) Construction of a single storey flat roof extension (22.75m2) with parapet wall at the rear (east) elevation of existing dwellinghouse, iii) Insert 1no. window on ground floor to side (south) wall of existing rear annex, and iv) All associated site works.

No.112 The Spires Carrignafoy Cobh Co. Cork

37m
06/6599INCOMPLETED APPLICATION24 Apr 2006

Extension to dwellinghouse

14 The Spires Carrignafoy Cobh

37m
06/7653CONDITIONAL30 May 2006

Attic conversion and installation of dormer window and rooflights to dwellinghouse

No.14, The Spires Carrignafoy Cobh

62m
05/767CONDITIONAL14 Feb 2005

Alterations, garage conversion and first floor extension to dwellinghouse

Carrignafoy Cobh

62m
04/9771INCOMPLETED APPLICATION31 Dec 2004

Extension to garage to incorporate 2 no. bedrooms and change of use of garage to family room

Carrignafoy Cobh

68m
07/10805INCOMPLETED APPLICATION6 Sept 2007

Retention of second floor attic conversion and dormer windows to dwellinghouse

No.28, The Spires Carrignafoy Cobh

68m
07/11157CONDITIONAL21 Sept 2007

Retention of conversion of attic and installation of dormer windows to dwellinghouse

No.28, The Spires Carrignafoy Cobh

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?