← Back to search

No.112 The Spires Carrignafoy Cobh Co. Cork

Conditional Permission

Planning application 25/5326

Cork - Cork County Council

Proposed Development

  1. A)
    Permission to construct a single storey extension to the front (West) elevation
  2. B)
    Retention Permission for the as built existing single storey rear extension (37.9m²). *Note: Rear extension was previously granted Permission under PL. Reg. No. 21/05915, but this existing extension at the time was built bigger, the parapet overhang was revised and some ope revisions to the rear and side (South) elevations of existing dwelling.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Jul 2025

  2. Decision: Conditional Permission

    27 Aug 2025

  3. Decision due

    28 Aug 2025

  4. Grant issued

    3 Oct 2025

Application Details

Location
No.112 The Spires Carrignafoy Cobh Co. Cork
Applicant
N/A
Application Type
Permission for Retention
Planning Authority
Cork County Council

Timeline

Registration Date
4 July 2025
Status
Application Closed
Decision
Conditional Permission
Decision Date
27 August 2025
Grant Date
3 October 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
21/5915CONDITIONAL9 Jul 2021

i) Removal of hipped roof over existing rear single storey annex, ii) Construction of a single storey flat roof extension (22.75m2) with parapet wall at the rear (east) elevation of existing dwellinghouse, iii) Insert 1no. window on ground floor to side (south) wall of existing rear annex, and iv) All associated site works.

No.112 The Spires Carrignafoy Cobh Co. Cork

0m
11/5476INCOMPLETED APPLICATION8 Jul 2011

Construction of ground floor side extension, first floor extension and all associated site works

112 The Spires Carrignafoy Cobh

0m
11/5591CONDITIONAL22 Jul 2011

Construction of ground floor side extension, first floor extension to dwellinghouse and all associated site works

112 The Spires Carrignafoy Cobh

34m
18/7016CONDITIONAL16 Nov 2018

A) Retention of i) atttic conversion to habitable space with the 2 no. existing velux rooflights, and ii) ground floor kitchen extension at the rear, all part of the existing dwellinghouse. B) Permission to install 2no. velux rooflights below existing rooflights in a combination system on both the front and rear roofs, so as to comply with fire escape regulations.

No. 106 The Spires Carrignafoy Cobh Co. Cork

34m
15/6875CONDITIONAL17 Dec 2015

(a) Construction of a single storey kitchen extension and installation of 2 no. rooflights to the ground floor dining room at the rear (north) of dwelling house together with a new external side door to the ground floor utility room, (b) construction of a first floor extension to the side (east) incorporating part use of the attic space as a walk-in wardrobe with a rooflight to the front (south), (c) conversion of existing attic space to provide bedroom and en-suite accommodation with a dormer window and rooflight to both the front and rear, together with all associated alterations and site works

18 The Spires Carrignafoy Cobh Co. Cork

71m
06/6599INCOMPLETED APPLICATION24 Apr 2006

Extension to dwellinghouse

14 The Spires Carrignafoy Cobh

71m
06/7653CONDITIONAL30 May 2006

Attic conversion and installation of dormer window and rooflights to dwellinghouse

No.14, The Spires Carrignafoy Cobh

73m
06/7101CONDITIONAL11 May 2006

Extension to dwelling

No.96, The Spires Carrignafoy Cobh

73m
03/5902REFUSED12 Nov 2003

Retention of entrance boundary wall

The spires Carrignafoy Cobh Co. Cork

77m
06/6192CONDITIONAL7 Apr 2006

Alterations, attic conversion with rooflights and extensions to dwellinghouse

No.101, The Spires Carrignafoy Cobh

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?