Proposed Development
(1) An extension to laboratory building to create a new entrance building with offices, including intake offices, ancillary areas and reception area, (2) alterations and partial change of use of existing laboratory building and engineering workshop building to create a new visitors display area with ancillary areas including new corridor area on 1st floor, (3) extension to laboratory building to provide bridge corridor access at 1st floor level to engineering workshop building, (4) 3 storey extension to engineering workshop building to provide stair, lift and bridge corridor access to existing dryer building and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
15 Jan 2016
Decision: CONDITIONAL
19 May 2016
Decision due
23 May 2016
Grant issued
30 Jun 2016
Application Details
- Location
- Annabella Mallow Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 15 January 2016
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 May 2016
- Grant Date
- 30 June 2016
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The works comprise (1) An extension to laboratory building to create a new entrance building (2) Modifications to the existing laboratory and engineering workshop building to create a new visitors corridor (3) New bridge access between laboratory and engineering workshop building (4) New stair, lift and bridge access between engineering workshop building and existing dryer building and associated site works
Annabella Mallow Co. Cork
Permission for construction of a toilet block extension to Mallow College of Further Education
Annabella Mallow Co. Cork.
alterations to the front and side elevations including the addition of an emergency exit, of the automobile workshop wing of Mallow College of Further Information
Annabella Mallow Co. Cork.
The construction of an enlarged entrance gateway with adjacent walling, signage to western boundary and entrance, driveway lighting and associated site works
Mallow College of Further Education West End, Annabella Mallow Co. Cork
Construction of an enlarged entrance gateway with adjacent walling, signage to western boundary and entrance, driveway lighting and associated site works.
Mallow College of Further Education West End, Annabella Mallow Co. Cork
Retention of existing Car Park and associated access roads
Annabella Mallow Co. Cork.
The removal of 2 no. existing advertising signs from the north and west facades of the existing Dryer Building and erection of 1 no. illuminated sign on the north facade and 1 no. illuminated sign on the south facade of the existing Dryer Building. The site has an Industrial Emmissions Directive Licence issued by the Environmental Protection Agency
Dairygold Dryer Facility West End, Annabella Mallow
Permission to construct a significant expansion of milk processing facility
Annabella Mallow Co. Cork.
Permission to construct a significant expansion of milk processing plant. This application includes an Environmental Impact Statement and a Natura Impact Statement.
Annabella Mallow Co. Cork.
Construct a significant Expansion of their Milk Processing Facility at Annabella, Mallow, Co. Cork. The Proposed Development consists of:- Alterations to the existing North Entrance / Exit, This Entrance / Exit will accommodate all Vehicles including Heavy Goods Vehicles (H.G.V.)., Alterations to the existing South Entrance/ Exit incorporating the construction of a Central Island. Alterations to the existing North Boundary fence adjoining Lower Beecher Street; Demolition of the following Buildings or Structures and associated services a) Milk Intake Unit; b) Pasteurisation and Separation Building; c) Elevated Tower (Coloured Blue and White), 22.7metres high, over the Engineering Workshop and Stores; d) Single Storey Utility Building; e) 2 Storey Office Building; f)Single Storey Milk Powder Storage Building incorporating elevated Storage Tower, 21.2metres high and Electrical Equipment Rooms and Offices; g) Packaging and Palleting Area Store; h) Security and Weighbridge Control Building and i) Covered Canopied Area North of the Engineering Workshop and Stores and removal of all associated Redundant Tankage. Construction of the following Buildings or structures and associated services;- a) Single Storey part Open sided, roofed, Milk Intake Unit; b) Part Single / Part 2 Storey Pasteurisation and Separation Building; c)Building incorporating a 6 Storey (41.3m) high Spray Dryer Unit housing 2No. Dryers; d) Evaporator Unit Building; e) Single Storey Milk Powder Storage Building; f) Packing and Palletising Area; g) Utility Building; h) 2 Storey Administration Building; i) Single Storey Security Building; j) Single Storey Weighbridge Control Building; k) 2 Surface Level Weighbridges; l)Single Storey Polisher Building; m) Open Sided Single Storey Chemical Intake Bay; n) Single Storey Transformer Building; o)suspended structural steel pipebridges; p) alterations to the 1st Floor Stores of the Engineering Workshop and Stores to form Offices.Provision of the following tankage, height listed in brackets and all services associated with the tankage: 8 No. Raw Milk Storage Tanks (19.9m); 3 No. Cream Storage Tanks(11.4m); 3 No. Pasteurised Milk Storage Tanks (19.9m); 8 No. Vegetable Oil Storage Tanks (15.9m); 2 No. Milk Ingredient Storage Tanks(19.9m); 5 No. Raw Milk Cleaning Tanks (4.6m); 4 No. Pasteuriser Milk Cleaning Tanks (4.6m); 4 No. Pasteurised Milk Cleaning Tanks (4.6m); 3 No. Bulk Chemical Storage Tanks (8.1m); 8 No. Water Condensate Tanks (15.0m); 1 No. Proc
West End Annabella Mallow Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?