Mallow College of Further Education West End, Annabella Mallow Co. Cork
CONDITIONALPlanning application 19/4812
Cork - Cork County Council
Proposed Development
The construction of an enlarged entrance gateway with adjacent walling, signage to western boundary and entrance, driveway lighting and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
3 Apr 2019
Decision: CONDITIONAL
10 Oct 2019
Decision due
17 Oct 2019
Grant issued
15 Nov 2019
Application Details
- Location
- Mallow College of Further Education West End, Annabella Mallow Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 3 April 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 10 October 2019
- Grant Date
- 15 November 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of an enlarged entrance gateway with adjacent walling, signage to western boundary and entrance, driveway lighting and associated site works.
Mallow College of Further Education West End, Annabella Mallow Co. Cork
Retention of existing Car Park and associated access roads
Annabella Mallow Co. Cork.
Permission for construction of a toilet block extension to Mallow College of Further Education
Annabella Mallow Co. Cork.
alterations to the front and side elevations including the addition of an emergency exit, of the automobile workshop wing of Mallow College of Further Information
Annabella Mallow Co. Cork.
Construct a two storey domestic garage and carry out associated site works
4 Annabella Terrace Mallow Co Cork
The works comprise (1) An extension to laboratory building to create a new entrance building (2) Modifications to the existing laboratory and engineering workshop building to create a new visitors corridor (3) New bridge access between laboratory and engineering workshop building (4) New stair, lift and bridge access between engineering workshop building and existing dryer building and associated site works
Annabella Mallow Co. Cork
(1) An extension to laboratory building to create a new entrance building with offices, including intake offices, ancillary areas and reception area, (2) alterations and partial change of use of existing laboratory building and engineering workshop building to create a new visitors display area with ancillary areas including new corridor area on 1st floor, (3) extension to laboratory building to provide bridge corridor access at 1st floor level to engineering workshop building, (4) 3 storey extension to engineering workshop building to provide stair, lift and bridge corridor access to existing dryer building and associated site works
Annabella Mallow Co. Cork
Installation of a 3m high ‘lamp post’ style relief vent stack servicing the existing below ground natural gas pressure reduction unit with all ancillary services and associated site works
Limerick Road DRIug Limerick Road Annabella, Mallow Co. Cork
Permission for: 1. Demolition of the existing extension and garage to the side and rear of the existing dwelling house and 2 no. detached store buildings, 2. Change of use of the existing 2 storey dwelling house to 2 no. residential apartments, 3. To construct 4 no. town houses, 4. To construct a new bin store and bicycle store with revised layout of car parking spaces, with all associated site and ancillary works.
Annabella Mallow Co Cork
1) Demolition of the existing extension and garage to the side and rear of the existing dwelling house and 2 no. detached store buildings. 2) Change of use of the existing 2 storey dwelling house to 2 no. residential apartments. 3) Construct 4 no. townhouses. 4) Construct a new bin store and bicycle store with revised layout of car parking spaces. 5) Alter the existing site entrance for vehicular access with all associated site and ancillary works.
Annabella Mallow Co.Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?