Ringaskiddy Co. Cork

CONDITIONAL

Planning application 16/6219

Cork - Cork County Council

Proposed Development

The development will consist of the extraction of approximately 134,000m3 of materials comprising of topsoil and subsoil from an area of approximately 9.3 hectares within an overall site area 12.1 hectares; on-site screening and crushing of some excavated material; transport of approximately 114,000m3 of material off site to East Tip, Haulbowline Island, Ringaskiddy; remediation, reprofiling and landscaping of site with retained material post extraction. The development will also comprise a new vehicular site entrance at the location of an existing agricultural entrance to the L6517, internal site access road, and associated drainage features. An EIS will be submitted to the Planning Authority with the application.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Sept 2016

  2. Decision due

    26 Oct 2016

  3. Decision: CONDITIONAL

    26 Oct 2016

  4. Grant issued

    2 Dec 2016

Application Details

Location
Ringaskiddy Co. Cork .
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
1 September 2016Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 October 2016
Grant Date
2 December 2016

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

186m
11/6527CONDITIONAL2 Dec 2011

Construction of a 222 sq metre single storey extension to the existing open roofed waste storage compound to the north west of the existing manufacturing facility permitted under Pl. Reg. No. 01/4145 increasing the total area for the compound to 422sq metres. The above facility is ancillary to the existing production and plant areas

Loughbeg Ringaskiddy .

186m
11/6483INCOMPLETED APPLICATION25 Nov 2011

Construction of a 222sq metre single storey extension to the existing open roofed waste storage compound to the north west (Planning Reg. No. 01/4145) of the existing manufacturing facility increasing the total area for the compound to 422 sq metres. The above facility is ancillary to the existing production and plant areas

Loughhbeg Ringaskiddy Co. Cork

246m
13/6262CONDITIONAL29 Nov 2013

The construction of a security building at the existing entrance road security barrier and a car park with 202 spaces and associated site works for use ancillary to the existing manufacturing facility

Loughbeg Ringaskiddy

253m
20/4200CONDITIONAL6 Feb 2020

a) The demolition of a 107 square metre single storey timber framed structure and cladded canopy within the loading bay area to the north of the existing production facility, b) the construction of 1 no. single storey extension within the loading bay area to the north and 1 no. single storey extension to the north west of the existing production facility and c) all associated modifications and site development works.

Loughbeg Ringaskiddy Co. Cork

354m
18/7056CONDITIONAL22 Nov 2018

Installation of a solar photovoltaic (PV) array on the roof of production facility within a site of 0.32ha. The array will consist of c.1825sq.m of PV modules. The proposed PV array will have a maximum generating capacity of c.300kW.

Loughbeg Ringaskiddy Co. Cork

396m
17/7092CONDITIONAL28 Nov 2017

Retention of a 240 square meter two storey structure for office use on the east side of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas

Loughbeg Ringaskiddy Co. Cork

424m
08/8235INCOMPLETED APPLICATION1 Aug 2008

New entrance from public road, the regrading, hardcoring and blinding of the site and the provision of surface water drainage, low level retaining walls, boundary fencing,signage, lighting and landscaping

Loughbeg Ringaskiddy

424m
08/8507WITHDRAWN21 Aug 2008

Provision of new graded entrance from public road, the regrading, hardcoring and blinding of the site and the provision of surface water drainage, low level retaining walls, boundary fencing, signage, lighting and landscaping for use for open storage of finished products and building materials

Loughbeg Ringaskiddy

442m
14/4476REFUSED7 Mar 2014

Change of use of building A from a light industrial use to a waste transfer station on a site of c. 2.086ha (c. 5.15 acres). The proposed development comprises drainage works including grit trap, full retention oil interceptor, fire water retention area, and rainwater harvesting tanks, new concrete slab, weighbridge, elevational alterations, external odour control unit with 20m high stack, vehicle parking, vehicle workshop and all site development works. The site is served by the existing access to Ringport Business Park from Loughbeg Road. An Environmental Impact Statement (EIS) will be submitted to the Planning Authority with the application.

Building A, Ringport Business Park Loughbeg Ringaskiddy, Co Cork

496m
10/4078INCOMPLETED APPLICATION20 Jan 2010

Retention of a 60metre high meteorological data collection mast at Loughbeg. The period of retention in relation to this application is 2 years

Loughbeg Industrial Estate Loughbeg Ringaskiddy