← Back to search

Quartertown Industrial Estate Mallow Co. Cork

CONDITIONAL

Planning application 16/6343

Cork - Cork County Council

Proposed Development

The construction of a warehouse/production building extension on the eastern side of the existing warehouse/production building

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Sept 2016

  2. Decision due

    14 Sept 2017

  3. Decision: CONDITIONAL

    14 Sept 2017

  4. Grant issued

    20 Oct 2017

Application Details

Location
Quartertown Industrial Estate Mallow Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
22 September 2016Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
14 September 2017
Grant Date
20 October 2017

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

35m
10/55026WITHDRAWN31 May 2010

Consturction of a toilet building within their existing allotment area adjacent to the Hi-Cone building as well as the laying of a new sewer through the Hi-Cone site to connect to the existing public sewer on the adjacent industrial estate road

Quartertown Lower Mallow Co. Cork.

60m
06/55006CONDITIONAL3 Feb 2006

1) construction of warehouse building 2) extension of existing warehouse building and carrying out of all associated site works

Quartertown Ind Est Quartertown Lower Mallow Co. Cork.

103m
06/55085CONDITIONAL29 Nov 2006

Construction of an extension to existing building for light, industrial, warehouse. distribution use with office area and associated works.

Quartertown Ind Est Mallow Co Cork

110m
26/2305Application Withdrawn4 Sept 2026

To relocate an existing vehicular entrance ,onto the existing industrial estate road, from the west side of the site to the south side of the site, together with all associated site works

Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork, P51 XC7K

110m
26/2583Awaiting Recommendation6 Oct 2026

Permission for an additional vehicular entrance & driveway onto the existing industrial estate road to the south side of the existing premises, together with all associated site works.

Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork, P51 XC7K

136m
24/6514Conditional Permission23 Dec 2024

Permission for the construction of 1 No. new light engineering high bay manufacturing & assembly workshop and 1 No. light engineering storage building adjacent to existing light engineering manufacturing buildings and all associated works.

Quartertown Industrial Estate Quartertown Lower Mallow Co. Cork

185m
18/5099CONDITIONAL2 May 2018

Extension of an existing industrial building and alterations to existing elevations and floor plans. The works will comprise of (1) the extension of existing building, (2) alterations of existing elevations, (3) alterations to existing floor plans and (4) all associated site works.

IDA Business & Technology Park Quartertown Lower Mallow Cork, P51 DX59

220m
26/0945Grant with Conditions15 Apr 2026

The development will consist of (a) the construction of a single storey extension to the production area of Unit A on the North West Elevation, (b) first floor extension to the office area of Unit A and, (c) all associated site works.

Unit A, Clyda Business Park,, Quartertown Lower,, Mallow, Co. Cork, P51R858

234m
04/632CONDITIONAL6 Feb 2004

Construction of an advance light industrial unit with septic tank, signage and associated site works

Quartertown Lower Mallow

235m
07/55018WITHDRAWN23 Mar 2007

Erection of Bulk Silo, Associated Tanks & Boiler, Concrete Yard at rear & side of building.

Quartertown Ind Est Mallow Co Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?