Proposed Development
Construction of single storey extensions to side and rear of existing dwelling house, decommissioning of exiting septic tank and installation of waste water treatment system and percolation area..
Application Timeline
Application received
25 Nov 2016
Decision: CONDITIONAL
27 Jan 2017
Decision due
30 Jan 2017
Grant issued
6 Mar 2017
Application Details
- Location
- Killany Ballywilliam Kinsale
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 25 November 2016
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 27 January 2017
- Grant Date
- 6 March 2017
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of one and a half storey extension to dwelling and detached garage
Tisaxon More Dunderrow
Construction of storey and a half extension to dwelling, detached garage and treatment unit, extension of duration to permission granted under planning reg 06/13609
Tisaxon More Dunderrow Co. Cork
Construction of storey and a half extension to dwelling, detached garage and treatment unit
Tisaxon More Dunderrow
Construction of one and a half storey extension to dwelling and detached garage
Tisaxon More Dunderrow
Permission for development at Eli Lilly Kinsale pharmaceutical manufacturing campus. The proposed development will consist of: (1) Construction of a 3 storey laboratory extension to the existing laboratory/administration building (known as IE28) to comprise gross floor area of approximately 4,277sqm with height to parapet of approximately 19.62m and maximum height (roof top mechanical unit lourve) of 24.25m. (2) Re-alignment of the existing internal security fence and provision of pedestrian turnstile access. (3) All associated site development works including modification to adjacent internal site roads and site services, drainage connections, provision of hard standing areas and landscaping. The proposed development is located on a site that operates under an existing Industrial Emissions (IE) Licence (no. P0009-05) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environmental Act, 2003). The proposed development is on a site which the Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 (S.I 209 of 2015) applies.
Eli Lilly Campus, Ballythomas West, Ballythomas East, Horsehill More (North) & Ballyvrin Lower, Dunderrow, Kinsale, Co. Cork.
Dwelling
Killany Kinsale
Permission for the construction for two new server rooms and associated works. The proposed development consists of the construction of two permanent prefabricated server buildings within the pharmaceutical production site, each with a height of up to 5.5 metres, with external plant and equipment located adjacent to the buildings, associated with the operation of the server equipment. The proposed development is covered by an Industrial Emissions Directive Licence No. P0009-05. As the proposed development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the third schedule of the Major Accident Regulations will be submitted with the application.
Ballythomas West Dunderrow Co Cork
Permission for the construction of two new server rooms and associated works. The proposed development consists of the construction of two permanent prefabricated server buildings within the pharmaceutical production site, each with a height of up to 5.5 metres, with external plant and equipment located adjacent to the buildings, associated with the operation of the server equipment. The proposed development is covered by an Industrial Emissions Directive Licence No. P0009-05. As the proposed development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.
Ballythomas West Dunderrow Kinsale Co Cork
Permission for the construction of a pedestrian footbridge across an existing stream within the Eli Lilly pharmaceutical facility, and associated site works. The bridge will have a length of approx. 17.9m (13.1m span plus landing areas of 2.4m at either end) and a two-way 2.4m wide walkway and will be located on a site area of approx. 0.23ha. The application site falls within the Eli Lilly industrial complex, which operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) and is also an establishment to which the Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies.
Eli Lilly Pharmaceutical Complex Ballythomas East & Ballythomas West Dunderrow Kinsale Co Cork
Permission for the construction of a pedestrian footbridge across an existing stream within the Eli Lily pharmaceutical facility, and associated works. The bridge will have a length of approx. 17.9m (13.1 span plus landing areas of 2.4m at either end) and a two-way 2.4m wide walkway and will be located on a site area of approx. 0.23ha. The application site falls within the Eli Lilly industrial complex, which operates under an Industrial Emissions (IE) licence (P0009-04) under part IV of the Environmental Protection Agency Act 1992 (as amended by the protection of the Environmental Act, 2003) and is also an establishment to which the Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies
Eli Lilly Pharmaceutical Complex Ballythomas East & Ballythomas West Dunderrow Kinsale, Co. Cork