"Clonmore" Ballyviniter Lower Mallow Co. Cork
CONDITIONALPlanning application 16/6949
Cork - Cork County Council
Proposed Development
- 1)The construction of 108 no. dwelling houses, consisting of 3 no. 4 bed detached, 2 no. 3 bed detached, 68 no. 4 bed semi-detached, 32 no 3 bed semi-detached and 3 no. 3 bed terraced houses. These houses are to be accessed through the existing completed part of the housing development
- 2)A crèche of 380sq.m of single/two storey construction, also accessed from the existing completed part of the housing development, including 11 carparking spaces and associated works
- 3)The provision of a 1.2m diameter culvert within the development. This leads to an open water course which is to be provided in lieu of the existing pipeworks along the western boundary of the site
- 4)All associated site development works.
Application Timeline
Application received
28 Nov 2016
Decision due
5 Mar 2018
Decision: CONDITIONAL
5 Mar 2018
Application Details
- Location
- "Clonmore" Ballyviniter Lower Mallow Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 28 November 2016Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 5 March 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Erection of 38kV steel mast
Ballyviniter Lower Mallow
The construction of 18 no. dwellings houses consisting of 14 no. Type G, 3 bedroom semi detached dwellings, 4 no. Type C, 3 bedroom semi detached dwellings and ancillary site works. The proposed development is a change of plan and change of house type from that permitted under planning reference no. ABP-301429-18.
Hazel Hill Hazel Brooke Spaglen Mallow, Co. Cork
Installation of a 0.50m x 0.87m x 1.62m (LxWxH) above ground enclosure, to house a new natural gas District Regulating Installation including a 3m high ‘lamp post’ style relief vent stack with all ancillary services and associated site works to alter the network pressure.
Hazel Brooke Parkadallane Co. Cork
Domestic garage, play room and utility shed
Ballyviniter Lower Mallow
Demolition of dwelling and construction of bungalow
Ballyviniter Lower Mallow
Extensions to dwellinghouse
Meadowbrook Spaglen Mallow
(1) The retention of an existing domestic garage/store, (2) for alterations to the front and side of existing dwelling and a single storey extension to the side of same dwelling and all associated and site works.
Ballyvorisheen TD & Ballyviniter Lower TD Mallow Co. Cork
Permission for the construction of playing/training lights and all associated works
Parkadallane, Mallow, Cork, P51YP08
Permission for development to consist of the erection of 6 No. playing/training floodlights at the existing pitch, together with all associated works.
Keatleysclose, Mallow, Co. Cork
One and half storey dwellinghouse
Ballyviniter Lower Mallow
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?