Planning application 18/5333

Cork - Cork County Council

Proposed Development

Construct 2 no.. temporary classrooms, measuring 156 square metre in modular portacabin single-storey form and all ancillary site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 May 2018

  2. Decision due

    17 Jul 2018

Application Details

Location
Scoil Mhuire Naofa Main Street Carrigtohill (Td.) Carrigtwohill, Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
23 May 2018
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
17 July 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

5m
18/5616CONDITIONAL22 Jun 2018

2 no. temporary classrooms measuring 156 square metre in modular portacabin single storey form and all ancillary site works

Scoil Mhuire Naofa Main Street Carrigtohill Co. Cork

22m
15/4594CONDITIONAL27 Mar 2015

Construction of a temporary two-storey portacabin modular building containing 2 no. classrooms and all other related ancillary works on lands to rear of existing school building

St. Marys Boys National School Main Street Carrigtohill

44m
13/4601CONDITIONAL5 Apr 2013

Construction of a temporary two storey 4 classroom portacabin modular building at rear of existing school building

St. Marys Boys National School Main Street Carrigtohill

61m
13/4600INCOMPLETED APPLICATION5 Apr 2013

Retention of 3 temporary 76 square metre portacabin modular units at rear of existing school building

St. Marys Boys National School Main Street Carrigtohill

61m
13/4728CONDITIONAL22 Apr 2013

Retention of 3 no. temporary 76 square metre portacabin modular units for classroom use on its lands at the rear of existing school building (Planning Reg. Nos. 06/10922 and 07/8360 refer)

St Mary's Boys National School Main Street Carrigtohill

69m
25/4609INCOMPLETED APPLICATION7 Apr 2025

Provision of an all-weather playing field facility of c. 40m x 85m incorporating a 40m two-sided x 5m RC ball wall, fenced and netted and access gates. Provision of 200 lux lighting system. Relocation southwards of existing adult playing field c. 140m x 85m by c 40m with ancillary drainage works, fencing and repositioning of existing training lights. Repositioning and re-erection of existing end line ball containing nets at southern and northern ends of relocated playing field.

GAA Ground West End Carrigtohill Carrigtwohill Co Cork

69m
25/4828Conditional Permission2 May 2025

Provision of an all weather playing field facility c. 40m x 85m incorporating a c. 40m x 5m RC ball wall, fenced and netted, and access gates, provision of 200 lux lighting system, relocation southwards by c. 40m of existing adult playing field, c. 140m x 85m with ancillary drainage works, fencing and repositioning of existing training lights, repositioning and re-erection of existing end line ball containing nets at southern and northern ends of the relocated playing field.

Carrigtwohill GAA Grounds West End Carrigtohill Carrigtwohill Co Cork

70m
13/4599INCOMPLETED APPLICATION5 Apr 2013

Retention of a temporary 42 square metre portacabin modular unit at rear of existing school building

St. Marys Boys National School Main Street Carrigtohill

70m
13/4729CONDITIONAL22 Apr 2013

Retention of a temporary 42 square metre portacabin modular unit for classroom use on its lands at the rear of existing school building

St Mary's Boys National School Main Street Carrigtohill

72m
20/5073CONDITIONAL28 May 2020

To construct a new storey and half type dwelling house & domestic garage, demolish existing domestic shed, construct new gated entrance and the existing memorial cross to be moved to the western boundary wall of the proposed site and all associated site works.

West End Carrigtohill Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.