Scoil Mhuire Naofa Main Street Carrigtohill Co. Cork
CONDITIONALPlanning application 18/5616
Cork - Cork County Council
Proposed Development
2 no. temporary classrooms measuring 156 square metre in modular portacabin single storey form and all ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
22 Jun 2018
Decision: CONDITIONAL
14 Aug 2018
Decision due
16 Aug 2018
Grant issued
20 Sept 2018
Application Details
- Location
- Scoil Mhuire Naofa Main Street Carrigtohill Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 22 June 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 August 2018
- Grant Date
- 20 September 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construct 2 no.. temporary classrooms, measuring 156 square metre in modular portacabin single-storey form and all ancillary site works.
Scoil Mhuire Naofa Main Street Carrigtohill (Td.) Carrigtwohill, Co. Cork
Construction of a temporary two-storey portacabin modular building containing 2 no. classrooms and all other related ancillary works on lands to rear of existing school building
St. Marys Boys National School Main Street Carrigtohill
Construction of a temporary two storey 4 classroom portacabin modular building at rear of existing school building
St. Marys Boys National School Main Street Carrigtohill
Retention of 3 temporary 76 square metre portacabin modular units at rear of existing school building
St. Marys Boys National School Main Street Carrigtohill
Retention of 3 no. temporary 76 square metre portacabin modular units for classroom use on its lands at the rear of existing school building (Planning Reg. Nos. 06/10922 and 07/8360 refer)
St Mary's Boys National School Main Street Carrigtohill
Retention of a temporary 42 square metre portacabin modular unit at rear of existing school building
St. Marys Boys National School Main Street Carrigtohill
Retention of a temporary 42 square metre portacabin modular unit for classroom use on its lands at the rear of existing school building
St Mary's Boys National School Main Street Carrigtohill
To construct a new storey and half type dwelling house & domestic garage, demolish existing domestic shed, construct new gated entrance and the existing memorial cross to be moved to the western boundary wall of the proposed site and all associated site works.
West End Carrigtohill Co. Cork
Provision of an all-weather playing field facility of c. 40m x 85m incorporating a 40m two-sided x 5m RC ball wall, fenced and netted and access gates. Provision of 200 lux lighting system. Relocation southwards of existing adult playing field c. 140m x 85m by c 40m with ancillary drainage works, fencing and repositioning of existing training lights. Repositioning and re-erection of existing end line ball containing nets at southern and northern ends of relocated playing field.
GAA Ground West End Carrigtohill Carrigtwohill Co Cork
Provision of an all weather playing field facility c. 40m x 85m incorporating a c. 40m x 5m RC ball wall, fenced and netted, and access gates, provision of 200 lux lighting system, relocation southwards by c. 40m of existing adult playing field, c. 140m x 85m with ancillary drainage works, fencing and repositioning of existing training lights, repositioning and re-erection of existing end line ball containing nets at southern and northern ends of the relocated playing field.
Carrigtwohill GAA Grounds West End Carrigtohill Carrigtwohill Co Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?