Proposed Development
Demolition of 6no. buildings consisting of 3no. fattening houses, weaner house, dry sow/farrowing house, and pump house. Construction of 8no. low emission pig houses consisting of 4no. fattening houses, 2no. weaner houses, dry sow house and farrowing house. The development also includes an extension to the existing farrowing house. Construction of a covered loading bay/yard area, computer room/ pump house, store/office building, and 5no. feed bins, 4no. water tanks, yard area with 2m high perimeter fencing, 2no. covered underground pig manure storage tanks, landscaped earth berm to screen the site. Construction of additional internal road areas, storm/soiled water collection systems and associated site works for the extension to the existing integrated pig farm. Extension of Duration of Permission granted under planning ref: 12/6635 and ABP ref: PL.04.241892
Application Timeline
Application received
3 Aug 2018
Decision: UNCONDITIONAL
24 Sept 2018
Decision due
27 Sept 2018
Application Details
- Location
- Annistown Killeagh Co. Cork
- Applicant
- N/A
- Application Type
- EXTENSION OF DURATION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 3 August 2018
- Status
- APPLICATION FINALISED
- Decision
- UNCONDITIONAL
- Decision Date
- 24 September 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Demolition of 6no. buildings consisting of 3no. fattening houses, weaner house, dry sow/farrowing house, and pump house. Construction of 8no. low emission pig houses consisting of 4no. fattening houses, 2no. weaner houses, dry sow house and farrowing house. The development also includes an extension to the existing farrowing house. Construction of a covered loading bay/yard area, computer room/ pump house, store/office building, and 5no. feed bins, 4no. water tanks, yard area with 2m high perimeter fencing, 2no. covered underground pig manure storage tanks, landscaped earth berm to screen the site. Construction of additional internal road areas, storm/soiled water collection systems and associated site works for the extension to the existing integrated pig farm.
Annistown Killeagh Co.Cork
12 no. low emission pig houses consisting of dry sow house, farrowing house, services house, first stage weaner house, 3 no. second stage weaner houses, 5 no. fattening houses with loading bay, feed and pump house and 8 no. feed bins, covered slurry storage basin, servicing concrete and hardcore yard areas complete with storm and foul water collection systems and associated site works including landscaped earthern berm to screen the site
Annistown Killeagh
10 no. pig houses, covered manure storage with landscaped earthen burn for 600 no. sow integrated unit with 8 no. meal bins, servicing concrete and hardcore yards with complete storm water and foul water and collection systems
Annistown Killeagh
Closure of 1no. agricultural entrance and opening of 2no. new agricultural entrances and associated site works
Annistown Garranejames Killeagh , Co. Cork
Construction of two storey dwelling with detached garage and car-port link together with waste water treatment system, access driveway, vehicular site entrance and all associated site development works
Annistown Mogeely killeagh Co.Cork
Construction of an easy feed passage unit with incorporated slatted covered slurry tank and a stand alone slatted covered soiled water tank
Annistown Killeagh
Extension to rear of existing dwelling house including the alterations and refurbishment of existing, alterations to existing site entrance, new wastewater treatment system and all associated site works
Garranejames Killeagh Co.Cork
Dwelling
Garranejames Mogeely
Permission for development of an Anaerobic Digestion Facility (Biogas Renewable Energy Facility) The proposed development will consist of the following: 1) Upgraded vehicular entrance and access road, including a new car park for staff, visitor, and users of the adjacent public riverside walk, 2) 2 no. weighbridges for separate inbound and outbound weighing, 3) site office building with on-site laboratory, canteen, changing facilities and offices. GFA 161.70m2 Ridge height 8.35m, 4) car park area, 5) workshop and spares storage building, GFA 1,000m2 Ridge Height 10m, 6) Machinery and vehicle storage hardstand area, hardstanding areas for vehicle manoeuvring and storage 7) Anaerobic digestion tanks and associated vessels located within a concrete-based bunded area with ramped access, 8) Wet AD technology comprising 1 no. buffer tank, 2 no. primary digester tanks, and 2 no. secondary digester tanks with integrated pump-room, 9) 4 no. digestate storage tanks, 10) 3 no. pasteurization vessels, 11) 2 no. feed reception tanks, 12) Associated effluent and gas pipework with pumps, 13) Feedstock storage clamp building with feeder units, including ABPR changing room (operational only if Type 1 ABPR authorization is granted) and fast closing doors. GFA 6517m2 Ridge Height 12.460m, 14) Emergency Flare with base and security fencing, 15) Containerized Gas CHP unit with concrete base, associated containerized control unit, and containerized heat distribution unit. 16) Containerized biogas upgrading treatment system with associated hard standing, 17) Containerised Biomethane Network Entry Facility (Gas Offtake) provided by Gas Networks Ireland (GNI), with direct connection to the national gas grid, 18) Drying and Pelletizing, Pellet Storage and Nutrient Recovery Building. GFA 3,000m2 Ridge Height 11.5m, 19) Ammonium Sulphate recovered via vacuum evaporation stored in dedicated double-bunded tanks. 20) Electric Transformer and sub-station with associated hardstanding and security fence, 21) Integrated Drainage system with underground interceptor/storage tanks. Effluent from non-process hardstanding areas will be collected separately from process effluent; all contaminated effluent will be recirculated into the process via buffer tanks, 22) Geomembrane-lined rainwater harvesting pond with earth bunding; after mechanical cleaning and UV sterilisation, water will be reused on site as process water. 23) Odour abatement system comprising an ammonium scrubber and a biofilter with associated fans and ducting, 24) Boundary earth bunding, landscaping scheme, and new fencing, 25) internal street lighting columns with security camera provision. and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34d(b), the provision of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Deerpark, Mogeely, Co.Cork
Demolition of cottage and outhouse and construction of dwelling
Carrignashinny Mogeely
Planning a project of your own?