← Back to search

Deerpark, Mogeely, Co.Cork

Invalid - Case Closed

Planning application 25/6068

Cork - Cork County Council

Proposed Development

Permission for development of an Anaerobic Digestion Facility (Biogas Renewable Energy Facility) The proposed development will consist of the following:

  1. 1)
    Upgraded vehicular entrance and access road, including a new car park for staff, visitor, and users of the adjacent public riverside walk, 2) 2 no. weighbridges for separate inbound and outbound weighing
  2. 3)
    site office building with on-site laboratory, canteen, changing facilities and offices. GFA 161.70m2 Ridge height 8.35m
  3. 4)
    car park area
  4. 5)
    workshop and spares storage building, GFA 1,000m2 Ridge Height 10m
  5. 6)
    Machinery and vehicle storage hardstand area, hardstanding areas for vehicle manoeuvring and storage
  6. 7)
    Anaerobic digestion tanks and associated vessels located within a concrete-based bunded area with ramped access
  7. 8)
    Wet AD technology comprising 1 no. buffer tank, 2 no. primary digester tanks, and 2 no. secondary digester tanks with integrated pump-room, 9) 4 no. digestate storage tanks, 10) 3 no. pasteurization vessels, 11) 2 no. feed reception tanks, 12) Associated effluent and gas pipework with pumps, 13) Feedstock storage clamp building with feeder units, including ABPR changing room (operational only if Type 1 ABPR authorization is granted) and fast closing doors. GFA 6517m2 Ridge Height 12.460m, 14) Emergency Flare with base and security fencing, 15) Containerized Gas CHP unit with concrete base, associated containerized control unit, and containerized heat distribution unit. 16) Containerized biogas upgrading treatment system with associated hard standing, 17) Containerised Biomethane Network Entry Facility (Gas Offtake) provided by Gas Networks Ireland (GNI), with direct connection to the national gas grid, 18) Drying and Pelletizing, Pellet Storage and Nutrient Recovery Building. GFA 3,000m2 Ridge Height 11.5m, 19) Ammonium Sulphate recovered via vacuum evaporation stored in dedicated double-bunded tanks. 20) Electric Transformer and sub-station with associated hardstanding and security fence, 21) Integrated Drainage system with underground interceptor/storage tanks. Effluent from non-process hardstanding areas will be collected separately from process effluent; all contaminated effluent will be recirculated into the process via buffer tanks, 22) Geomembrane-lined rainwater harvesting pond with earth bunding; after mechanical cleaning and UV sterilisation, water will be reused on site as process water. 23) Odour abatement system comprising an ammonium scrubber and a biofilter with associated fans and ducting, 24) Boundary earth bunding, landscaping scheme, and new fencing, 25) internal street lighting columns with security camera provision. and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34d(b), the provision of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
View the full application file on the council's planning portal →

Application Details

Location
Deerpark, Mogeely, Co.Cork
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
1 October 2025
Status
Invalid - Case Closed
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

469m
17/4805CONDITIONAL5 Apr 2017

Construction of two storey dwelling with detached garage and car-port link together with waste water treatment system, access driveway, vehicular site entrance and all associated site development works

Annistown Mogeely killeagh Co.Cork

473m
05/8024CONDITIONAL1 Nov 2005

Demolition of cottage and outhouse and construction of dwelling

Carrignashinny Mogeely

480m
07/9080CONDITIONAL28 Jun 2007

Construct slatted unit, silage slab and associated site works

Carrignashinny Mogeely

483m
06/10237CONDITIONAL1 Sept 2006

Dwelling

Carrignashinny Mogeely

483m
23/6052INCOMPLETED APPLICATION10 Oct 2023

Permission to renovate existing dwelling, demolish existing single storey lean-to side extension & construct a new single storey side extension, install 2 no. roof lights to existing roof of dwelling (west facing) elevational changes to existing dwelling, install a new waste water treatment system & percolation area and all associated site works

Carrignashinny Mogeely Co.Cork

508m
05/1162CONDITIONAL28 Feb 2005

Dwellinghouse and new vehicular entrance to serve dwelling and for agricultural use

Carrignashinny Mogeely

510m
08/4759REFUSED14 Feb 2008

Retention and completion of entrance to dwellinghouse

Carrignashinny Mogeely

519m
18/4844CONDITIONAL6 Apr 2018

Construction of a single storey dwellinghouse, vehicular entrance, wastewater treatment system and all associated site works

Carrignashinny Mogeely

536m
18/6052UNCONDITIONAL3 Aug 2018

Demolition of 6no. buildings consisting of 3no. fattening houses, weaner house, dry sow/farrowing house, and pump house. Construction of 8no. low emission pig houses consisting of 4no. fattening houses, 2no. weaner houses, dry sow house and farrowing house. The development also includes an extension to the existing farrowing house. Construction of a covered loading bay/yard area, computer room/ pump house, store/office building, and 5no. feed bins, 4no. water tanks, yard area with 2m high perimeter fencing, 2no. covered underground pig manure storage tanks, landscaped earth berm to screen the site. Construction of additional internal road areas, storm/soiled water collection systems and associated site works for the extension to the existing integrated pig farm. Extension of Duration of Permission granted under planning ref: 12/6635 and ABP ref: PL.04.241892

Annistown Killeagh Co. Cork

536m
12/6635CONDITIONAL21 Dec 2012

Demolition of 6no. buildings consisting of 3no. fattening houses, weaner house, dry sow/farrowing house, and pump house. Construction of 8no. low emission pig houses consisting of 4no. fattening houses, 2no. weaner houses, dry sow house and farrowing house. The development also includes an extension to the existing farrowing house. Construction of a covered loading bay/yard area, computer room/ pump house, store/office building, and 5no. feed bins, 4no. water tanks, yard area with 2m high perimeter fencing, 2no. covered underground pig manure storage tanks, landscaped earth berm to screen the site. Construction of additional internal road areas, storm/soiled water collection systems and associated site works for the extension to the existing integrated pig farm.

Annistown Killeagh Co.Cork

The submission window has closed

Observations on this application closed on Tuesday 4 November 2025, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?