Carrignashinny Mogeely Co.Cork
INCOMPLETED APPLICATIONPlanning application 23/6052
Cork - Cork County Council
Proposed Development
Permission to renovate existing dwelling, demolish existing single storey lean-to side extension & construct a new single storey side extension, install 2 no. roof lights to existing roof of dwelling (west facing) elevational changes to existing dwelling, install a new waste water treatment system & percolation area and all associated site works
Application Timeline
Application received
10 Oct 2023
Decision due
4 Dec 2023
Application Details
- Location
- Carrignashinny Mogeely Co.Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 10 October 2023
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 4 December 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construct slatted unit, silage slab and associated site works
Carrignashinny Mogeely
Demolition of cottage and outhouse and construction of dwelling
Carrignashinny Mogeely
Dwelling
Carrignashinny Mogeely
Construction of a single storey dwellinghouse, vehicular entrance, wastewater treatment system and all associated site works
Carrignashinny Mogeely
Dwellinghouse and new vehicular entrance to serve dwelling and for agricultural use
Carrignashinny Mogeely
Retention and completion of entrance to dwellinghouse
Carrignashinny Mogeely
Construction of a storey and a half dwelling, garage, wastewater treatment unit and associated site works
Carrignashinny Mogeely Castlemartyr
Construction of two storey dwelling with detached garage and car-port link together with waste water treatment system, access driveway, vehicular site entrance and all associated site development works
Annistown Mogeely killeagh Co.Cork
Permission for development of an Anaerobic Digestion Facility (Biogas Renewable Energy Facility) The proposed development will consist of the following: 1) Upgraded vehicular entrance and access road, including a new car park for staff, visitor, and users of the adjacent public riverside walk, 2) 2 no. weighbridges for separate inbound and outbound weighing, 3) site office building with on-site laboratory, canteen, changing facilities and offices. GFA 161.70m2 Ridge height 8.35m, 4) car park area, 5) workshop and spares storage building, GFA 1,000m2 Ridge Height 10m, 6) Machinery and vehicle storage hardstand area, hardstanding areas for vehicle manoeuvring and storage 7) Anaerobic digestion tanks and associated vessels located within a concrete-based bunded area with ramped access, 8) Wet AD technology comprising 1 no. buffer tank, 2 no. primary digester tanks, and 2 no. secondary digester tanks with integrated pump-room, 9) 4 no. digestate storage tanks, 10) 3 no. pasteurization vessels, 11) 2 no. feed reception tanks, 12) Associated effluent and gas pipework with pumps, 13) Feedstock storage clamp building with feeder units, including ABPR changing room (operational only if Type 1 ABPR authorization is granted) and fast closing doors. GFA 6517m2 Ridge Height 12.460m, 14) Emergency Flare with base and security fencing, 15) Containerized Gas CHP unit with concrete base, associated containerized control unit, and containerized heat distribution unit. 16) Containerized biogas upgrading treatment system with associated hard standing, 17) Containerised Biomethane Network Entry Facility (Gas Offtake) provided by Gas Networks Ireland (GNI), with direct connection to the national gas grid, 18) Drying and Pelletizing, Pellet Storage and Nutrient Recovery Building. GFA 3,000m2 Ridge Height 11.5m, 19) Ammonium Sulphate recovered via vacuum evaporation stored in dedicated double-bunded tanks. 20) Electric Transformer and sub-station with associated hardstanding and security fence, 21) Integrated Drainage system with underground interceptor/storage tanks. Effluent from non-process hardstanding areas will be collected separately from process effluent; all contaminated effluent will be recirculated into the process via buffer tanks, 22) Geomembrane-lined rainwater harvesting pond with earth bunding; after mechanical cleaning and UV sterilisation, water will be reused on site as process water. 23) Odour abatement system comprising an ammonium scrubber and a biofilter with associated fans and ducting, 24) Boundary earth bunding, landscaping scheme, and new fencing, 25) internal street lighting columns with security camera provision. and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34d(b), the provision of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Deerpark, Mogeely, Co.Cork
Construction of a two storey extension (with a floor area of 39.2m2 and a height to apex of 5.977m)to the rear of an existing bungalow dwelling house (floor area of 125m2 and height to apex of 5.465m), the fitting of a velux window to the front of the bungalow and associated ancillary works
Garranejames Killeagh Co. Cork
The submission window has closed
Observations on this application closed on Monday 13 November 2023, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?