Quartertown Industrial Estate Quartertown Lower Quartertown Mallow, Co. Cork

INCOMPLETED APPLICATION

Planning application 20/4211

Cork - Cork County Council

Proposed Development

Retention of existing ancillary cladded buildings and plastic tank to side of existing industrial unit as erected on site and planning permission for the construction of a new extension and alterations to the industrial unit for use in association with the existing packaging facility being carried out in the said industrial unit.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Feb 2020

  2. Decision due

    2 Apr 2020

Application Details

Location
Quartertown Industrial Estate Quartertown Lower Quartertown Mallow, Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
7 February 2020
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
2 April 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
08/55002CONDITIONAL15 Jan 2008

Retention for changes to roof structure to extensions to rear and modification to roadside elevation to the existing building from that granted under Planning Permission P.D. 2099

Quartertown Ind. Estate Quartertown Mallow Co. Cork.

0m
20/4413CONDITIONAL27 Feb 2020

Retention of 1 No. existing cladded building used for storage of packaging equipment, 1 No. cladded building used as compressor room and 1 No. plastic water storage tank all to side of existing industrial unit and planning permission for the construction of a new extension and alterations to the industrial unit for use in association with the existing packaging facility being carried out in the said industrial unit.

Quartertown Industrial Estate Quartertown Mallow Co. Cork

36m
06/55085CONDITIONAL29 Nov 2006

Construction of an extension to existing building for light, industrial, warehouse. distribution use with office area and associated works.

Quartertown Ind Est Mallow Co Cork

70m
06/55039NEW APPLICATION9 May 2006

a) both an extension and alterations to the facades of the existing showroom including signage b) alterations to the rear facade of the existing workshop and c) construction of a concrete decked sales yard with a contrete access stairs and a metal vehicle access ramp and associated site works

Quartertown Ind. Estate Quartertown Mallow Co. Cork.

95m
14/5999CONDITIONAL18 Sept 2014

Extension on west side of existing production building and construction of a new detached boiler house at the rear of the production building

Quartertown Industrial Estate Quartertown Lower Mallow Co.Cork

95m
14/5932INCOMPLETED APPLICATION10 Sept 2014

An extension on the west side of the existing production building and the construction of a new detached boiler house at the rear of the production building. The application relates to development which comprises an activity requiring an integrated pollution prevention and control licence.

Quartertown Industrial Estate Quartertown Lower Mallow

116m
14/5404CONDITIONAL2 Jul 2014

Elevation alterations to the North, East and West of existing industrial building (known as the Hi-Cone facility). The alterations include new cladding, new entrance canopy, and 2no. access doors, signage and associated site works

Quartertown Industrial Estate Quartertown Mallow

116m
14/5291INCOMPLETED APPLICATION17 Jun 2014

Elevation alterations to the North, East & West of the existing industrial building (known as the Hi-Cone facility). The alterations include new cladding, new entrance canopy, and 2no. access doors, signage and associated site works

Quartertown Industrial Estate Quartertown Lower Mallow Co.Cork

118m
10/55026WITHDRAWN31 May 2010

Consturction of a toilet building within their existing allotment area adjacent to the Hi-Cone building as well as the laying of a new sewer through the Hi-Cone site to connect to the existing public sewer on the adjacent industrial estate road

Quartertown Lower Mallow Co. Cork.

118m
20/6379CONDITIONAL30 Oct 2020

The development will consist of a warehouse extension to the eastern side of the existing warehouse/production building, utilities area including tank farm and utilities equipment, additional parking and all associated site works. The application relates to a development which comprises an activity requiring an integrated pollution prevention and control licence.

Quartertown Industrial Estate Quatertown Lower Mallow Co. Cork

The submission window has closed

Observations on this application closed on Thursday 12 March 2020, five weeks after it was received. The authority cannot accept a late submission.