Ballyclough AGI (Above Ground Installation) West End Annabella Mallow, Co. Cork
CONDITIONALPlanning application 20/6152
Cork - Cork County Council
Proposed Development
The development will consist of replacing approximately 155m of existing 2.4m high chainlink fence and associated access/emergency gates with 155m of new 2.4m high green palisade security fencing/gates and all associated site work at an existing above ground natural gas installation.
View the full application file on the council's planning portal →Application Timeline
Application received
2 Oct 2020
Decision: CONDITIONAL
19 Nov 2020
Decision due
26 Nov 2020
Grant issued
23 Dec 2020
Application Details
- Location
- Ballyclough AGI (Above Ground Installation) West End Annabella Mallow, Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 2 October 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 November 2020
- Grant Date
- 23 December 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(a) Extend the height of the existing vent stack on Dryer 2 by 18m together with the necessary steelwork and access ladders; (b) extend the height of the existing vent stack on Dryer 1 by 10m together with the necessary steelwork and access ladders; (c) extend the height of the permitted stack on Dryer 3 by 10m together with necessary steelwork and access ladders; (d) extend the height of 2 no. extract ducts on the Evaporator building by 10m and provide steel access stairs. The application relates to an establishment which has an Industrial Emissions License (P0403-03).
Annabella West End Mallow Co. Cork
demolition of store with leanto asbestos roof and development of 16 no. car parking spaces for staff use and associated landscaping works
Annabella Mallow Co. Cork.
PERMISSION FOR ERECTION OF A PREFABRICATED OFFICE FOR USE AS A DRIVING TEST CENTRE
COUNTY COUNCIL OFFICES ANNABELLA MALLOW CO. CORK.
The removal of 2 no. existing advertising signs from the north and west facades of the existing Dryer Building and erection of 1 no. illuminated sign on the north facade and 1 no. illuminated sign on the south facade of the existing Dryer Building. The site has an Industrial Emmissions Directive Licence issued by the Environmental Protection Agency
Dairygold Dryer Facility West End, Annabella Mallow
Permission to construct a significant expansion of milk processing facility
Annabella Mallow Co. Cork.
Permission to construct a significant expansion of milk processing plant. This application includes an Environmental Impact Statement and a Natura Impact Statement.
Annabella Mallow Co. Cork.
Construct a significant Expansion of their Milk Processing Facility at Annabella, Mallow, Co. Cork. The Proposed Development consists of:- Alterations to the existing North Entrance / Exit, This Entrance / Exit will accommodate all Vehicles including Heavy Goods Vehicles (H.G.V.)., Alterations to the existing South Entrance/ Exit incorporating the construction of a Central Island. Alterations to the existing North Boundary fence adjoining Lower Beecher Street; Demolition of the following Buildings or Structures and associated services a) Milk Intake Unit; b) Pasteurisation and Separation Building; c) Elevated Tower (Coloured Blue and White), 22.7metres high, over the Engineering Workshop and Stores; d) Single Storey Utility Building; e) 2 Storey Office Building; f)Single Storey Milk Powder Storage Building incorporating elevated Storage Tower, 21.2metres high and Electrical Equipment Rooms and Offices; g) Packaging and Palleting Area Store; h) Security and Weighbridge Control Building and i) Covered Canopied Area North of the Engineering Workshop and Stores and removal of all associated Redundant Tankage. Construction of the following Buildings or structures and associated services;- a) Single Storey part Open sided, roofed, Milk Intake Unit; b) Part Single / Part 2 Storey Pasteurisation and Separation Building; c)Building incorporating a 6 Storey (41.3m) high Spray Dryer Unit housing 2No. Dryers; d) Evaporator Unit Building; e) Single Storey Milk Powder Storage Building; f) Packing and Palletising Area; g) Utility Building; h) 2 Storey Administration Building; i) Single Storey Security Building; j) Single Storey Weighbridge Control Building; k) 2 Surface Level Weighbridges; l)Single Storey Polisher Building; m) Open Sided Single Storey Chemical Intake Bay; n) Single Storey Transformer Building; o)suspended structural steel pipebridges; p) alterations to the 1st Floor Stores of the Engineering Workshop and Stores to form Offices.Provision of the following tankage, height listed in brackets and all services associated with the tankage: 8 No. Raw Milk Storage Tanks (19.9m); 3 No. Cream Storage Tanks(11.4m); 3 No. Pasteurised Milk Storage Tanks (19.9m); 8 No. Vegetable Oil Storage Tanks (15.9m); 2 No. Milk Ingredient Storage Tanks(19.9m); 5 No. Raw Milk Cleaning Tanks (4.6m); 4 No. Pasteuriser Milk Cleaning Tanks (4.6m); 4 No. Pasteurised Milk Cleaning Tanks (4.6m); 3 No. Bulk Chemical Storage Tanks (8.1m); 8 No. Water Condensate Tanks (15.0m); 1 No. Proc
West End Annabella Mallow Co. Cork
The works comprise (1) An extension to laboratory building to create a new entrance building (2) Modifications to the existing laboratory and engineering workshop building to create a new visitors corridor (3) New bridge access between laboratory and engineering workshop building (4) New stair, lift and bridge access between engineering workshop building and existing dryer building and associated site works
Annabella Mallow Co. Cork
(1) An extension to laboratory building to create a new entrance building with offices, including intake offices, ancillary areas and reception area, (2) alterations and partial change of use of existing laboratory building and engineering workshop building to create a new visitors display area with ancillary areas including new corridor area on 1st floor, (3) extension to laboratory building to provide bridge corridor access at 1st floor level to engineering workshop building, (4) 3 storey extension to engineering workshop building to provide stair, lift and bridge corridor access to existing dryer building and associated site works
Annabella Mallow Co. Cork
Permission for construction of a toilet block extension to Mallow College of Further Education
Annabella Mallow Co. Cork.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?