← Back to search

an gCill Mhór Béal Átha'n Ghaorthaidh Co. Chorcaí Kilmore, Ballingeary

CONDITIONAL

Planning application 21/6248

Cork - Cork County Council

Proposed Development

Cead do na nithe seo a leanas: 1. Scartáil foirgnimh scoite / sean-uachtarlann, 2. Tógáil foirgnimh scoite nua ag cuimsiú (i) giomnáisiam agus (ii) láthair stórála le haghaidh trealaimh agus innealra do pháirc imeartha an Chumainn, 3. Oibreacha láithreáin bhreise lena n-áirítear láthair pháirceála agus balla agus geataí iontrála nua. - Permission for: 1. Demolition of detached building / old creamery, 2. Construction of new detached replacement building comprising (i) gymnasium and (ii) storage area for equipment and machinery for the G.A.A playing field, 3. Associated site works including car parking and new entrance walls and gates.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Aug 2021

  2. Decision: CONDITIONAL

    16 Dec 2021

  3. Decision due

    23 Dec 2021

  4. Grant issued

    3 Feb 2022

Application Details

Location
an gCill Mhór Béal Átha'n Ghaorthaidh Co. Chorcaí Kilmore, Ballingeary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
13 August 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
16 December 2021
Grant Date
3 February 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
22/5321CONDITIONAL8 Jun 2022

Cead do na nithe seo a leanas: 1. Scartáil foirgnimh scoite / sean-uachtarlann, 2. Tógáil foirgnimh scoite nua ag cuimsiú (i) giomnáisiam agus (ii) láthair stórála le haghaidh trealaimh agus innealra do pháirc imeartha an Chumainn, 3. Oibreacha láithreáin bhreise lena n-áirítear láthair pháirceála agus balla agus geataí iontrála nua. - Permission for: 1. Demolition of detached building / old creamery, 2. Construction of new detached replacement building comprising (i) gymnasium and (ii) storage area for equipment and machinery for the G.A.A playing field, 3. Associated site works including car parking and new entrance walls and gates.

An gCill Mhór, Kilmore Béal Átha'n Ghaorthaidh Ballingeary, Co. Chorcaí

59m
19/4748CONDITIONAL27 Mar 2019

To increase the finished floor level height and roof and ridge height to existing dwellinghouse which will include alterations to front and rear elevations to the existing dwellinghouse along with all associated site works.

Dromanallig Ballingeary Co. Cork

78m
05/4913CONDITIONAL11 Jul 2005

Chun seomrai gleasta nua a thogail chomh maith le foirgnimh cunta, clai teorann pairce nua, coras solais nua don phairc, athruithe a dheanamh ar an sli isteach ata ann faoi laithair, chuid do na seomrai gleasta ata ann a leagaint chomh maith le oibreacha suimh cunta

Choill Mhoir Beah Atha'n Ghaorthaidh

78m
08/8647CONDITIONAL29 Aug 2008

Retention of viewing terracing, roadside boundary wall with pedestrian and vehicular entrances, eastern boundary wall with internal planter bed, retaining wall to southern side of playing pitch with dug outs together with pedestrian access bridge

Kilmore Ballingeary

98m
06/5109CONDITIONAL27 Feb 2006

Alterations and extension to church

Dromanallig Ballingeary

105m
22/4205CONDITIONAL3 Feb 2022

Permission for change of use of dwelling house to Museum/Community hall, for alterations to fenestration and elevations of same and for construction of new accessible street access ramp and steps

Dromanallig Ballingeary Co.Cork

122m
10/4238CONDITIONAL9 Feb 2010

Demolition of existing dwelling and construction of dwelling

Dromanallig Ballingeary Macroom

132m
26/0484Grant with Conditions27 Feb 2026

Refurbishment of an existing two-storey commercial building to provide approximately 90m² of commercial floor space, together with the change of use of part of this building to residential use to provide a two-storey, four-bedroom dwelling. Demolition of an existing two-storey storage building and lean-to structures. Construction of 2 no. two-storey semi-detached dwellings. Provision of car parking, bicycle parking, and all associated site works and connections to existing services.

DROM AN AILIGH, Béal Átha an Ghaorthaidh (Ballingeary), Co. Cork, P12Y015

132m
25/6945Prepare Invalid Letter22 Dec 2025

Refurbishment of an existing two-storey commercial building to provide approximately 90m² of commercial floor space, together with the change of use of part of this building to residential use to provide a two-storey, four-bedroom dwelling. Demolition of an existing two-storey storage building and lean-to structures. Construction of 2 no. two-storey semi-detached dwellings. Provision of car parking, bicycle parking, and all associated site works and connections to existing services.

DROM AN AILIGH, Béal Átha an Ghaorthaidh (Ballingeary), Co. Cork, P12Y015

143m
10/4235CONDITIONAL9 Feb 2010

Alterations to include raising of ground floor level by one metre and revise elevations to existing dwelling

Dromanallig Ballingeary Macroom

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?