Proposed Development
The construction of a new entrance to serve existing dwelling house, (2) retention of altered elevations to dwelling house to those permitted under planning ref: 03/1175, (3) the retention of Southern extension to dwelling house, (4) the demolition of Southern extension to dwelling house, (5) retention of existing garage as constructed and (6) all associated site works
Application Timeline
Application received
31 Aug 2021
Decision: CONDITIONAL
21 Oct 2021
Decision due
26 Oct 2021
Grant issued
26 Nov 2021
Application Details
- Location
- Baltydaniel West Mallow Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 31 August 2021Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 October 2021
- Grant Date
- 26 November 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for a change to condition number 11 of planning reference 24/6313, which required the northern site entrance to be blocked up. Permission is now being sought to keep the northern site entrance and to close the southern site entrance.
Baltydaniel East and Baltydaniel West, Mallow, Co. Cork. P51 WF9D
1) Permission for retention of the existing dwelling as constructed (change of layout and design from that previously granted under reference number 75/925). 2) Permission for retention of the attached lean-to storage area to side of dwelling. 3) Permission for decommissioning of the existing septic tank and installation of a new wastewater treatment system. 4) Permission for retention of the existing site boundaries (change to the site boundary granted under reference 75/925).
Baltydaniel East & Baltydaniel West Mallow Co.Cork
Dwellinghouse
Baltydaniel East Mallow
Dormer dwelling
Baltydaniel East Mallow
Dormer bungalow
Baltydaniel East Mallow
A detached domestic garage.
Baltydaniel East Mallow Co. Cork
Permission for retention for the as built entrance walls and front boundary wall serving the dwelling house constructed under planning ref. 04/8818
Baltydaniel East Mallow Co. Cork
Dwellinghouse
Baltydaniel East Mallow
The construction of new waste water treatment plant including (a) Control building, (b) over-ground glass lined steel SBR (Sequential Batch Reactor Wastewater Treatment process) tank, (c) overground precast concrete sludge holding tank, (d) underground balance tanks, (e) underground pump sump, (f) compound fencing and gates, (g) relocation of existing containerised kiosk (to be used for the storage of equipment and bunded containers of liquid additives for use in treatment process) (h) de-commissioning of existing wastewater treatment plant and (i) all ancillary works associated with the proposed development to serve their existing manufacturing plant
Baltydaniel West and Baltydaniel East Mallow Co.Cork
Demolition of existing old dwelling and construction of bungalow
Baltydaniel West Mallow