208, Harbour Point Business Park Courtstown Little Island Co. Cork
CONDITIONALPlanning application 21/6777
Cork - Cork County Council
Proposed Development
Permission for a block bunker to enclose an existing generator and the retention of the part of bunker already built.
Application Timeline
Application received
13 Oct 2021
Decision due
7 Dec 2021
Decision: CONDITIONAL
7 Dec 2021
Grant issued
20 Jan 2022
Application Details
- Location
- 208, Harbour Point Business Park Courtstown Little Island Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 13 October 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 7 December 2021
- Grant Date
- 20 January 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of 3 no. enterprise unit blocks, each consisting of 8 no. units and construction of 2 no. ESB substations and switchrooms, access roads, hardstanding, car parking, 2 no. entrances, signage and all associated site works
Courtstown Little Island
Erection of signage on existing enterprise unit
201/202 Harbour Point Business Park Courtstown Little Island Co Cork
We, Inver Energy Limited, wish to apply for full planning permission for the following proposed works: 1) construct new site entrance; 2) install new unmanned overground fuel dispensing unit; 3) erect new ID sign; and 4) all associated site works at site located at Harbour Point Business Park, Little Island, Co. Cork.
Harbour Point Business Park, Little Island, Co. Cork
Warehouse building with total floor area of 6,015.2sq.m, car parking and yards, new entrances off the existing Estates Road, site levelling/contouring and all associated site works on site of 1.6525 hectares.
Harbour Point Business Park Courtstown Little Island Co. Cork
Warehouse/Light Industrial Unit totalling 4576sqm, car parking & yard, surface water sewer, foul sewer, watermain, site levelling, lighting & landscaping on a site of 1.425ha
Harbour Point Business Park Courtstown Little Island
Change of use of existing warehouse from heavy vehicle assembly plant to waste plastic processing plant
Value Engineering Courtstown Ind. Estate Courtstown Little Island
The construction of a Portakabin site office and meeting room totalling 195 sq m gross floor area and use of the land as open storage of Portakabin buildings placed up to two units high on the northern and western sections of the site and extending up to 7.48m above ground level together with all ancillary development. Access is to be taken from the existing access point on the southern corner of the site. Utilities and Services are to be brought to the site office on the south-eastern side of the site. The compound will be secured by way of a 2.4m high galvanised fence.
Site 4 Harbour Point Business Park Courtstown Little Island Cork
The construction of a Portakabin site office and meeting room totaling 195 sqm gross floor area and use of land as open storage and refurbishment of Portakabin buildings for use off-site placed up to two units high on the northern and western sections of the site and extending up to 7.48m above ground level together with all ancillary development. Access is to be taken from the existing access point on the southern corner of the site. Utilities and services are to be brought to the site office on the south-eastern side of the site. The compound will be secured by way of a 2.4m high galvanised fence.
Site 4 Harbour Point Business Park Courtstown Little Island Cork
The construction of two strategic logistical, storage and distribution warehouse units, incorporating office accommodation, 2No. bicycle shelters, Associated site signage (4No. 1.8m high totem signs), adjusted site entrance access off existing estates road, site levelling and contouring, 2No. waste compactors, truck loading, hardstanding and truck parking bay areas, 66No. car parking spaces of which includes, 4No. disabled spaces, and 4No. electric charging spaces, and all other ancillary and associated site development works including landscaping.
Harbour Point Business Park Courtstown Little Island Co. Cork
The construction of 2 no. Strategic Logistical, storage and distribution warehouse units, incorporating office accommodation, 2 no. bicycle shelters, associated site signage (4 no. 1.8m high totem signs), adjusted site entrance access off existing Estates Road, site levelling and contouring, 2no. waste compactors, truck loading, hardstanding and truck parking bay areas, 66 no. car parking spaces of which include, 4 no. disabled spaces, and 4 no. electric charging spaces, and all other ancillary and associated site development works including landscaping. A Natura Impact Statement will be submitted to the planning authority with the application.
Harbour Point Business Park Courtstown Little Island Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?