Site 4 Harbour Point Business Park Courtstown Little Island Cork
WITHDRAWNPlanning application 19/5166
Cork - Cork County Council
Proposed Development
The construction of a Portakabin site office and meeting room totaling 195 sqm gross floor area and use of land as open storage and refurbishment of Portakabin buildings for use off-site placed up to two units high on the northern and western sections of the site and extending up to 7.48m above ground level together with all ancillary development. Access is to be taken from the existing access point on the southern corner of the site. Utilities and services are to be brought to the site office on the south-eastern side of the site. The compound will be secured by way of a 2.4m high galvanised fence.
Application Details
- Location
- Site 4 Harbour Point Business Park Courtstown Little Island Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 8 May 2019
- Status
- WITHDRAWN
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The construction of a Portakabin site office and meeting room totalling 195 sq m gross floor area and use of the land as open storage of Portakabin buildings placed up to two units high on the northern and western sections of the site and extending up to 7.48m above ground level together with all ancillary development. Access is to be taken from the existing access point on the southern corner of the site. Utilities and Services are to be brought to the site office on the south-eastern side of the site. The compound will be secured by way of a 2.4m high galvanised fence.
Site 4 Harbour Point Business Park Courtstown Little Island Cork
The construction of two strategic logistical, storage and distribution warehouse units, incorporating office accommodation, 2No. bicycle shelters, Associated site signage (4No. 1.8m high totem signs), adjusted site entrance access off existing estates road, site levelling and contouring, 2No. waste compactors, truck loading, hardstanding and truck parking bay areas, 66No. car parking spaces of which includes, 4No. disabled spaces, and 4No. electric charging spaces, and all other ancillary and associated site development works including landscaping.
Harbour Point Business Park Courtstown Little Island Co. Cork
The construction of 2 no. Strategic Logistical, storage and distribution warehouse units, incorporating office accommodation, 2 no. bicycle shelters, associated site signage (4 no. 1.8m high totem signs), adjusted site entrance access off existing Estates Road, site levelling and contouring, 2no. waste compactors, truck loading, hardstanding and truck parking bay areas, 66 no. car parking spaces of which include, 4 no. disabled spaces, and 4 no. electric charging spaces, and all other ancillary and associated site development works including landscaping. A Natura Impact Statement will be submitted to the planning authority with the application.
Harbour Point Business Park Courtstown Little Island Co. Cork
We, Inver Energy Limited, wish to apply for full planning permission for the following proposed works: 1) construct new site entrance; 2) install new unmanned overground fuel dispensing unit; 3) erect new ID sign; and 4) all associated site works at site located at Harbour Point Business Park, Little Island, Co. Cork.
Harbour Point Business Park, Little Island, Co. Cork
Construction of 1 no. building comprising of 30 no. storage/light industrial units with ancillary works to include a retaining structure to rear of site bounding on site No.9 and sites No's 5 & 7, associated car parking spaces and associated delivery areas, 1 no. bicycle shelter, 30 no. nameplate signs, 1 no. site sign and construction of 1 no. site entrance(as permitted) and all associated site works
Site No.6 Harbour Point Business Pk Courtstown Little Island
Construction of 1 no. warehouse building comprising of 3 no. individual warehouse units with associated office areas, provision for 85 no. car spaces, 2 no. site entrances and associated site works
Courtstown Little Island
The change of use of Unit U4 from permitted use as a strategic logistical, storage and distribution warehouse unit, under Planning Reference 19/5276, for use as a light industry unit, including elevational amendments to existing permitted east elevation, to provide for 2no. roller doors, and 1no. dock leveller with reduced external canopy cover, and all other ancillary and associated site development works. A Natura Impact Statement will be submitted to the planning authority with the application.
Harbour Point Business Park Courtstown Little Island Co. Cork
Construction of two storey extension to ancillary office space at existing warehouse building, palisade fencing to the side (south east) and rear (north east) boundaries of site, new security gates to existing entrances, new exit to existing roadway from new extended hardstanding area, new signage to elevations of warehouse building, landscaping and associated site works
Courtstown Business Park Courtstown Little Island
Permission for a block bunker to enclose an existing generator and the retention of the part of bunker already built.
208, Harbour Point Business Park Courtstown Little Island Co. Cork
Warehouse/Light Industrial Unit totalling 4576sqm, car parking & yard, surface water sewer, foul sewer, watermain, site levelling, lighting & landscaping on a site of 1.425ha
Harbour Point Business Park Courtstown Little Island
The submission window has closed
Observations on this application closed on Tuesday 11 June 2019, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?