← Back to search

Ballyviniter Lower Mallow Co. Cork

CONDITIONAL

Planning application 22/4900

Cork - Cork County Council

Proposed Development

Permission to retain garage attached to dwelling, alterations to dwelling, and all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Apr 2022

  2. Decision: CONDITIONAL

    29 Jul 2022

  3. Decision due

    2 Aug 2022

  4. Grant issued

    15 Sept 2022

Application Details

Location
Ballyviniter Lower Mallow Co. Cork
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
20 April 2022Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
29 July 2022
Grant Date
15 September 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

155m
06/4452CONDITIONAL31 Jan 2006

Erection of 38kV steel mast

Ballyviniter Lower Mallow

191m
06/7222CONDITIONAL16 May 2006

Domestic garage, play room and utility shed

Ballyviniter Lower Mallow

191m
08/6919CONDITIONAL26 May 2008

Demolition of dwelling and construction of bungalow

Ballyviniter Lower Mallow

423m
19/6584INCOMPLETED APPLICATION30 Oct 2019

The construction of 18 no. dwellings houses consisting of 14 no. Type G, 3 bedroom semi detached dwellings, 4 no. Type C, 3 bedroom semi detached dwellings and ancillary site works. The proposed development is a change of plan and change of house type from that permitted under planning reference no. ABP-301429-18.

Hazel Hill Hazel Brooke Spaglen Mallow, Co. Cork

438m
22/5340INCOMPLETED APPLICATION9 Jun 2022

Installation of a 0.50m x 0.87m x 1.62m (LxWxH) above ground enclosure, to house a new natural gas District Regulating Installation including a 3m high ‘lamp post’ style relief vent stack with all ancillary services and associated site works to alter the network pressure.

Hazel Brooke Parkadallane Co. Cork

561m
20/6368CONDITIONAL28 Oct 2020

(1) The retention of an existing domestic garage/store, (2) for alterations to the front and side of existing dwelling and a single storey extension to the side of same dwelling and all associated and site works.

Ballyvorisheen TD & Ballyviniter Lower TD Mallow Co. Cork

622m
06/7520CONDITIONAL26 May 2006

Extensions to dwellinghouse

Meadowbrook Spaglen Mallow

771m
25/6499Invalid - Prepare Letters17 Nov 2025

Permission for the construction of playing/training lights and all associated works

Parkadallane, Mallow, Cork, P51YP08

771m
26/0600Awaiting F.I. Response11 Mar 2026

Permission for development to consist of the erection of 6 No. playing/training floodlights at the existing pitch, together with all associated works.

Keatleysclose, Mallow, Co. Cork

789m
05/7639CONDITIONAL19 Oct 2005

Retention of alterations and extension to ground floor, reconstruction of roof to include attic accommodation with 2 no. first floor windows and 3 no. rooflights, new front porch to existing dwelling and extension to domestic shed

Ballyvorisheen Mallow

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?