Springhill Carhoo, Carrigtwohill Co.Cork

INCOMPLETED APPLICATION

Planning application 22/6005

Cork - Cork County Council

Proposed Development

Development of 1 no. single storey CNG (compressed natural gas) compressor installation with a floor area of 23m2, 1 no. single ESB MV substation with a floor area of 33m2, 1.8m & 2.4m high fence, public access fueling dispensers, forecourt, fuel totem, access to existing private road and associated ground works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Sept 2022

  2. Decision due

    1 Nov 2022

Application Details

Location
Springhill Carhoo, Carrigtwohill Co.Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
5 September 2022Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
1 November 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

214m
08/6599CONDITIONAL8 May 2008

Change of use from a warehousing unit to a materials recovery facility & vehicle parking

Carhoo Carrigtwohill

214m
08/4026INCOMPLETED APPLICATION3 Jan 2008

Change of use from warehousing unit to materials recovery facility and vehicle parking

Carhoo Carrigtwohill

221m
03/590CONDITIONAL13 Feb 2003

Installation of windows and provision of two storey office area within existing industrial building

6,7 & 8, KILLACLOYNE,

696m
20/4090CONDITIONAL23 Jan 2020

The development will consist of (1) a single storey laboratory building to include plant and equipment area, office area, meeting rooms, canteen and kitchen, staff toilets, laboratories, IT room, electrical switch rooms and store rooms. The main laboratory building is 6.1 metres high, 44.5 metres long and 21.5 metres wide with vertical brise soleil screen offset from the southern facade. (2) An ESB substation of 3.18 metres high, 4.83 metres long and 4.32 metres wide is proposed to the rear of the building adjacent to the proposed service yard to the north of the main laboratory building. (3) The proposed development also includes 19 No. new car parking spaces comprising 2 No. visitor parking bays, 5 No. car pool parking bays. 1 No. wheelchair accessible parking bay, 2 No. dedicated electric vehicle charging bays, 2 No. motorcycle parking spaces and a covered bicycle shelter. (4) The proposed site works will include a 2.2 metre high, full perimeter security fence with new vehicular entrance gate and pedestrian turnstile entrance to the south east corner of the site, new entrance/exit to the proposed site, internal access roads pedestrian pathways, underground and overhead utilities, landscaping and all other associated site works.

The IDA Business and Technology Park Killacloyne Carrigtohill Co. Cork

696m
20/6074CONDITIONAL23 Sept 2020

Construction of ESB substation. The ESB substation including an adjacent switchroom will be 3.375m high, 7,650m long and 4.360m wide (change of location from that previously permitted under Pl.Reg.20/4090)

The IDA Business and Technology Park Killacloyne Carrigtohill Co. Cork

723m
22/4478CONDITIONAL4 Mar 2022

The construction of a new and upgraded entrance to replace existing agricultural entrance. The new entrance is required to access lands zoned industrial.

Killacloyne Carrigtwohill Co Cork

728m
21/5251CONDITIONAL10 May 2021

Installation of photovoltaic panels on the existing rooftop of the packaging and warehouse buildings. The proposed development will comprise of 1,458 no. new photovoltaic panels, total area of 3,340 m sq. on a mix of roof mounted and ballasted frames together with all ancillary cabling and electrical infrastructure modules over 3 phases.

Gilead Sciences Ireland UC IDA Business and Technology Park Anngrove Carrigtwohill, Co. Cork

897m
07/13099CONDITIONAL14 Dec 2007

Construction of office complex comprising of 3 no. three to five storey blocks, provision of 276 no. basement car parking spaces, rooftop plant area, 2 no. ESB substations and all associated site development works

Fota Retail & Bus. Park Killacloyne Carrigtohill

897m
12/5582INCOMPLETED APPLICATION18 Jul 2012

Construction of office complex comprising of 3 no. three to five storey blocks, provision of 276 no. basement car parking spaces, rooftop plant area, 2 no. ESB substations and all associated site development works, extension of duration to permission granted under planning reg 07/13099

Fota Business Park Killacloyne Carrigtohill Co. Cork

897m
13/4454UNCONDITIONAL19 Mar 2013

Construction of office complex comprising of 3 no. three to five storey blocks, provision of 276 no. basement car parking spaces, rooftop plant area, 2 no. ESB substations and all associated site development works, extension of duration of permission granted under Planning Reg. No. 07/13099

Fota Business Park Killacloyne Carrigtwohill

The submission window has closed

Observations on this application closed on Sunday 9 October 2022, five weeks after it was received. The authority cannot accept a late submission.