Watergate Street Knockbrogan Bandon Co.Cork
Conditional PermissionPlanning application 23/4015
Cork - Cork County Council
Proposed Development
The construction of a residential development of 20 no. apartments including: i) the partial demolition of the single storey over basement extension to the existing brewery building fronting onto Watergate Street and demolition of the existing two storey extensions, boiler house, portacabin, storage container and ancillary structures to the rear and : ii) the change of use, partial demolition, refurbishment and extension to the existing brewery building including the construction of replacement three storey extension fronting onto Watergate Street and 2 no. three storey extensions to the rear of the building to provide for 13 no. 2 bedroom and 7 no. 1 bedroom units, iii) the development also includes the provision of vehicular and pedestrian access via the upgrading of the existing entrance from Watergate street and all ancillary site works including bicycle and car parking, bin storage, landscaping and boundary treatments.
View the full application file on the council's planning portal →Application Timeline
Application received
11 Jan 2023
Decision due
25 Jan 2024
Decision: Conditional Permission
26 Jan 2024
Grant issued
15 Jan 2025
Application Details
- Location
- Watergate Street Knockbrogan Bandon Co.Cork
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 11 January 2023
- Status
- Application Closed
- Decision
- Conditional Permission
- Decision Date
- 26 January 2024
- Grant Date
- 15 January 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The construction of a residential development of 28 no. apartments, comprising 15 no. 2 bedroom and 13 no. 1 bedroom units, contained in three 2-4 storey buildings and all ancillary site works. The proposed development consists of: (1) the demolition of the single storey over basement extension to the existing industrial ‘Brewery’ building fronting onto Watergate Street and the demolition of existing two storey extensions, boiler house, portacabin, storage container and ancillary structures to the rear; (2) the change of use, partial demolition and refurbishment of the existing industrial ‘Brewery’ building (Block A) and the construction of replacement of three storey extension fronting onto Watergate Street, and replacement three storey extension to the rear to provide 18 no. apartment units; (3) the construction of a new four storey building (Block B) to the south of the ‘Brewery’ building to provide 8 no. apartment units; (4) the change of use and refurbishment of the existing two storey industrial building to the southwest of the site to contain 2 no. apartment units (Block C); (5) Ancillary site works including bicycle and car/motorcycle parking, bin storage, landscaped external amenity space and boundary treatments. Vehicular and pedestrian access to the proposed development will be provided via the existing entrance from Watergate Street, which will be upgraded.
Watergate Street Knockbrogan Bandon Co. Cork
Demolition of industrial and commercial structures and renovation of original brewery building, subdivision of same to provide 6 no. three storey live/work units each comprising of office accommodation at ground floor level and 1 no. two bedroom apartment on first and second floors, construction of 2 no. residential blocks, Block B comprising of 6 no. two bedroom apartments and Block C comprising of 21 no. two and three bedroom apartments over basement, provision for 46 no. car parking spaces at surface level and at basement level of Block C, vehicular access from existing entrance to site, seperate access point for pedestrians and emergency vehicles and all ancillary site development works to include pedestrian ramps/steps for access to apartments and basement parking, provision for riverside walk, landscaping, bin storage facilities, 6 no. floodgates, boundary fencing and lighting and associated site works and services
Watergate St Knockbrogan Bandon
Extension to dwelling
Lehina Watergate Street Knockbrogan Bandon
Alterations and change of use of dwellinghouse to use as extension to existing adjacent pre-school
Watergate Street Knockbrogan Bandon
Installation of an underground sewage pumping station and rising main to discharge to public sewer to serve existing dwelling and creche
Watergate Street Bandon Co. Cork
Alterations & extensions to dwelling
Lower Watergate Street Knockbrogan Bandon
Demolition of existing outbuilding and construction of 2 no. dwellinghouses
3 & 4 Watergate Terrace Knockbrogan Bandon
Dwellinghouse
Rear of No. 3 Watergate Terrace Knockbrogan Bandon
Demolition of the existing dwelling to the north of the site and the construction of 4 number terraced houses consisting of 2 number 3 bedroom and 2 number 2 bedroom dwellings, connection to the public mains along with any other ancillary site works.
Hillside, Fintan Road Knockbrogan Bandon Co. Cork
Demolition of existing dwelling to the north of the site and the construction of 4 number terraced houses consisting of 2 number 3 bedroom and 2 number 2 bedroom dwellings, connection to the public mains along with any other ancillary site works.
Hillside Fintan Road Knockbrogan, Bandon Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?