← Back to search

Raheens Barnahely Shanbally, Ringaskiddy Co.Cork

WITHDRAWN

Planning application 23/4361

Cork - Cork County Council

Proposed Development

Permission for one wind turbine only, to be located on the northern portion of the application site. Extension of Duration to Permission granted under Planning Ref. No. 11/4946; ABP ref 04.240330

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Mar 2023

  2. Decision due

    25 Apr 2023

Application Details

Location
Raheens Barnahely Shanbally, Ringaskiddy Co.Cork
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Cork County Council

Timeline

Registration Date
1 March 2023
Status
WITHDRAWN
Decision
Pending
Decision Due
25 April 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
11/4946CONDITIONAL29 Apr 2011

Erection of 2 no. wind turbines with hub height of up to 100m, blade radius of up to 50.5m and overall height from ground to tip of blade of up to 150.5m, upgrade of existing site roads, construction of internal site tracks and all other associated works

Raheens Barnahely Shanbally Ringaskiddy

65m
20/6070CONDITIONAL23 Sept 2020

An amendment to existing practices to use solvents and solid materials generated by manufacturing processes at other EPA licenced industrial facilities in Ireland as a supplementary fuel and feedstock in the existing waste treatment and recovery infrastructure at the site. The proposed development does not involve fundamental change from the present day on-site operations and will provide a beneficial alternative to the use of fossil fuel on the site. There will be no construction works associated with the proposed development. There will be no intensification of past use, no new emission points and no exceedance of the capacity thresholds and limits set in the existing Industrial Emissions licence. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0006-03. As the development refers to a modification to an establishment to which the Major Accident Directive applies information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.

Raheens, Barnahely Shanbally Ringaskiddy Co. Cork

72m
13/4764CONDITIONAL25 Apr 2013

10 Year Permission sought for construction of a small scale production facility. The facility consists of four storey extensions totalling 2774.39sqm in area and 22.2m in height to the south, east and north ends of the existing production building PB1A. The development will comprise production fit-out within the existing PB1A structure and the extensions will include production areas and production support facilities to the south, lift motor rooms and stairs enclosures to the north, service distribution enclosure to the east and enclosed plant room/open plant area at roof level. The existing east/west corridor will be extended to provide 722.65sqm over two storeys and 9.7m in height. A new single storey electrical substation with basement will be provided with a total floor area of 147sqm and 5m in height above ground. The development will include all associated on-site infrastructure.

Barnahely Shanbally Ringaskiddy Co.Cork

77m
16/4146CONDITIONAL29 Jan 2016

Permission for the construction of a new single storey extension to the south of the existing production building 1A(PB1A) with a floor area of 62sq.m and maximum height of 4.8m above ground. The development will include associated upgrades to the on-site infrastructure.

Raheens Barnahely, Shanbally Ringaskiddy Co. Cork

134m
13/5727CONDITIONAL5 Sept 2013

Construction of a three-storey extension to the existing small scale facility building (561) and a two-storey extension to the existing QA/QC Laboratory Building (441). The proposed 561 Building extension is 1457sqm in area and 23m in height and includes intermediate mezzanine floors above ground floor and first floor and an open plant area at roof level. The proposed 441 building extension is 1211sqm in area and 17m in height and includes an open plant area at roof level. The development will include all associated on-site infrastructure.

Novartis Ringaskiddy Limited Raheens, Barnehely Shanbally, Ringaskiddy Co.Cork

166m
08/6435INCOMPLETED APPLICATION30 Apr 2008

Retention of a community sounder which comprises of three pairs of Klaxon sirens mounted at the top of a galvanised steel mast (110mm in diameter) which extends 2300mm above the parapet of the rooftop penthouse of the PP1 building

Novartis Ringaskiddy Ltd. Raheens Shanbally/Barnahely Ringaskiddy

166m
08/7340CONDITIONAL17 Jun 2008

Retention of a community sounder comprising three pairs of klaxon sirens mounted on top of a galvanised steel mast (110mm in diameter) which extends 2300mm above the parapet of the rooftop penthouse of the existing PB1 Building

Raheens Ringaskiddy

166m
08/6845INCOMPLETED APPLICATION21 May 2008

Retention of Community Sounder comprising of three pairs of Klaxon Sirens mounted on 2300mm high (above parapet to rooftop penthouse of PB1) galvanised steel masts

Raheens Ringaskiddy

254m
08/6332INCOMPLETED APPLICATION25 Apr 2008

Extension to main car park to provide 84 no. additional spaces and realignment of adjacent site road to accommodate the proposed car park extension

Novartis Ringaskiddy Ltd. Raheens/Barnahely Shanbally/Ringaskiddy

255m
05/3769CONDITIONAL31 May 2005

New two storey small scale development facility building, two storey mechancial and electrical workshop and single storey porch extension to existing waste water treatment control building

Raheens/Barnahely Shanbally/Ringaskiddy

The submission window has closed

Observations on this application closed on Tuesday 4 April 2023, five weeks after it was received. The authority cannot accept a late submission.