Proposed Development
Retention of Community Sounder comprising of three pairs of Klaxon Sirens mounted on 2300mm high (above parapet to rooftop penthouse of PB1) galvanised steel masts
Application Details
- Location
- Raheens Ringaskiddy
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 21 May 2008
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of a community sounder which comprises of three pairs of Klaxon sirens mounted at the top of a galvanised steel mast (110mm in diameter) which extends 2300mm above the parapet of the rooftop penthouse of the PP1 building
Novartis Ringaskiddy Ltd. Raheens Shanbally/Barnahely Ringaskiddy
Retention of a community sounder comprising three pairs of klaxon sirens mounted on top of a galvanised steel mast (110mm in diameter) which extends 2300mm above the parapet of the rooftop penthouse of the existing PB1 Building
Raheens Ringaskiddy
Construction of a three-storey extension to the existing small scale facility building (561) and a two-storey extension to the existing QA/QC Laboratory Building (441). The proposed 561 Building extension is 1457sqm in area and 23m in height and includes intermediate mezzanine floors above ground floor and first floor and an open plant area at roof level. The proposed 441 building extension is 1211sqm in area and 17m in height and includes an open plant area at roof level. The development will include all associated on-site infrastructure.
Novartis Ringaskiddy Limited Raheens, Barnehely Shanbally, Ringaskiddy Co.Cork
Permission for the construction of a new single storey extension to the south of the existing production building 1A(PB1A) with a floor area of 62sq.m and maximum height of 4.8m above ground. The development will include associated upgrades to the on-site infrastructure.
Raheens Barnahely, Shanbally Ringaskiddy Co. Cork
Extension to main car park to provide 84 no. additional spaces and realignment of adjacent site road to accommodate the proposed car park extension
Novartis Ringaskiddy Ltd. Raheens/Barnahely Shanbally/Ringaskiddy
10 Year Permission sought for construction of a small scale production facility. The facility consists of four storey extensions totalling 2774.39sqm in area and 22.2m in height to the south, east and north ends of the existing production building PB1A. The development will comprise production fit-out within the existing PB1A structure and the extensions will include production areas and production support facilities to the south, lift motor rooms and stairs enclosures to the north, service distribution enclosure to the east and enclosed plant room/open plant area at roof level. The existing east/west corridor will be extended to provide 722.65sqm over two storeys and 9.7m in height. A new single storey electrical substation with basement will be provided with a total floor area of 147sqm and 5m in height above ground. The development will include all associated on-site infrastructure.
Barnahely Shanbally Ringaskiddy Co.Cork
New two storey small scale development facility building, two storey mechancial and electrical workshop and single storey porch extension to existing waste water treatment control building
Raheens/Barnahely Shanbally/Ringaskiddy
An amendment to existing practices to use solvents and solid materials generated by manufacturing processes at other EPA licenced industrial facilities in Ireland as a supplementary fuel and feedstock in the existing waste treatment and recovery infrastructure at the site. The proposed development does not involve fundamental change from the present day on-site operations and will provide a beneficial alternative to the use of fossil fuel on the site. There will be no construction works associated with the proposed development. There will be no intensification of past use, no new emission points and no exceedance of the capacity thresholds and limits set in the existing Industrial Emissions licence. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0006-03. As the development refers to a modification to an establishment to which the Major Accident Directive applies information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.
Raheens, Barnahely Shanbally Ringaskiddy Co. Cork
Planning permission is sought for construction of a new single storey equipment storage warehouse to the West of the existing project store with a floor area of 582.6sqm and 8m in height above ground, new two-storey training and development building to the Eastern side of the existing North South access corridor with a floor area of 836.6sqm and 11.6m in height above ground, a single storey cafeteria extension to the West of the existing administration building with a floor area of 154.8sqm and 3.3m in height above ground, a single storey office extension to the East of the existing administration building with a floor area of 154.8sqm and 3.3m in height above ground, a two-storey office and storage extension to the South of the existing East West connecting corridor at Production Building 1 with a floor area of 385.9sqm and 9.64m in height above ground, a two-storey office and storage extension to the South of the existing East West connecting corridor at Production Building 2 with a floor area of 448.1sqm and 9.64m in height above ground, A two-storey extension to the south of the existing NIPBI office building. The extension to the NIPBI building is to be built in 2 phases. Phase 1 will consist of ground floor offices with a floor area of 387.7sqm and a first floor plant room with a floor area of 96.5sqm and a maximum 5.88m in height above ground. Phase 2 will consist of ground floor offices with a floor area of 150sqm and a ground floor cafeteria of 74.5sqm and a maximum of 3.15m in height above ground. An extension to the Southern end of the existing surface level car park for an additional 40no. cars is included in this application. The development will include all associated on-site infrastructure.
Raheens Barnahely Shanbally Ringaskiddy, Co.Cork
Permission for one wind turbine only, to be located on the northern portion of the application site. Extension of Duration to Permission granted under Planning Ref. No. 11/4946; ABP ref 04.240330
Raheens Barnahely Shanbally, Ringaskiddy Co.Cork
The submission window has closed
Observations on this application closed on Tuesday 24 June 2008, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?