Raheens Barnahely Shanbally Ringaskiddy, Co.Cork
CONDITIONALPlanning application 14/5395
Cork - Cork County Council
Proposed Development
Planning permission is sought for construction of a new single storey equipment storage warehouse to the West of the existing project store with a floor area of 582.6sqm and 8m in height above ground, new two-storey training and development building to the Eastern side of the existing North South access corridor with a floor area of 836.6sqm and 11.6m in height above ground, a single storey cafeteria extension to the West of the existing administration building with a floor area of 154.8sqm and 3.3m in height above ground, a single storey office extension to the East of the existing administration building with a floor area of 154.8sqm and 3.3m in height above ground, a two-storey office and storage extension to the South of the existing East West connecting corridor at Production Building 1 with a floor area of 385.9sqm and 9.64m in height above ground, a two-storey office and storage extension to the South of the existing East West connecting corridor at Production Building 2 with a floor area of 448.1sqm and 9.64m in height above ground, A two-storey extension to the south of the existing NIPBI office building. The extension to the NIPBI building is to be built in 2 phases. Phase 1 will consist of ground floor offices with a floor area of 387.7sqm and a first floor plant room with a floor area of 96.5sqm and a maximum 5.88m in height above ground. Phase 2 will consist of ground floor offices with a floor area of 150sqm and a ground floor cafeteria of 74.5sqm and a maximum of 3.15m in height above ground. An extension to the Southern end of the existing surface level car park for an additional 40no. cars is included in this application. The development will include all associated on-site infrastructure.
Application Timeline
Application received
1 Jul 2014
Decision due
18 Mar 2015
Decision: CONDITIONAL
18 Mar 2015
Grant issued
27 Apr 2015
Application Details
- Location
- Raheens Barnahely Shanbally Ringaskiddy, Co.Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 1 July 2014
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 18 March 2015
- Grant Date
- 27 April 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Extension to existing NIPBI laboratory and 2 no. extensions to NIPBI offices, construction of internal rooftop storage area, external rooftop plant and all associated on-site infrastructure
Raheens Ringaskiddy
Single storey extension to existing NIPBI laboratory, 2 no. extensions to single storey NIPBI offices, external rooftop plant and all associated on-site infrastructure
Raheens Ringaskiddy
Construction of a single storey extension to the western side of the existing NIPBI laboratory building consisting of 8 no. laboratories with associted offices, stores and toilets at ground floor with a total gross floor area of 1,384 square metres, a partial first floor extension consisting of staff welfare facilities with a total gross floor area of 161 square metres, external roof top plant and all associated on-site infrastructure. It is proposed to construct the extension in 2 phases, phase 1 consisting of 4 ground floor laboratories, offices, stores and toilets and the first floor welfare rooms and external roof top plant to a height of 8.1 metres at its highest point. Phase 2 will consist of 4 laboratories, offices and stores at ground floor to a height of 5.45 square metres. The external architectural treatment of the new extension will match the existing NIPBI building.
Raheens Barnahely Shanbally Ringaskiddy
Extension to main car park to provide 84 no. additional spaces and realignment of adjacent site road to accommodate the proposed car park extension
Novartis Ringaskiddy Ltd. Raheens/Barnahely Shanbally/Ringaskiddy
New two storey small scale development facility building, two storey mechancial and electrical workshop and single storey porch extension to existing waste water treatment control building
Raheens/Barnahely Shanbally/Ringaskiddy
Construction of 84 no. space extension to existing car park, realignment of existing adjacent site road to accommodate car park extension, provision of associated drainage, lighting and landscaping
Raheens Ringaskiddy
Retention of a community sounder which comprises of three pairs of Klaxon sirens mounted at the top of a galvanised steel mast (110mm in diameter) which extends 2300mm above the parapet of the rooftop penthouse of the PP1 building
Novartis Ringaskiddy Ltd. Raheens Shanbally/Barnahely Ringaskiddy
Retention of a community sounder comprising three pairs of klaxon sirens mounted on top of a galvanised steel mast (110mm in diameter) which extends 2300mm above the parapet of the rooftop penthouse of the existing PB1 Building
Raheens Ringaskiddy
Retention of Community Sounder comprising of three pairs of Klaxon Sirens mounted on 2300mm high (above parapet to rooftop penthouse of PB1) galvanised steel masts
Raheens Ringaskiddy
Construction of an extension to the western end of the existing surface level car park, consisting of 103 no. car parking spaces. It is proposed to construct the car park in 2 phases. Phase 1 will consist of 77 car spaces and phase 2 will consist of 26 car spaces. The development will include all associated on-site infrastructure.
Raheens/Barnahely/shanbally Ringaskiddy Co Cork