Proposed Development
Extension to existing NIPBI laboratory and 2 no. extensions to NIPBI offices, construction of internal rooftop storage area, external rooftop plant and all associated on-site infrastructure
Application Timeline
Application received
6 Jun 2007
Decision: CONDITIONAL
27 Jul 2007
Decision due
31 Jul 2007
Grant issued
29 Aug 2007
Application Details
- Location
- Raheens Ringaskiddy
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 6 June 2007
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 27 July 2007
- Grant Date
- 29 August 2007
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of a single storey extension to the western side of the existing NIPBI laboratory building consisting of 8 no. laboratories with associted offices, stores and toilets at ground floor with a total gross floor area of 1,384 square metres, a partial first floor extension consisting of staff welfare facilities with a total gross floor area of 161 square metres, external roof top plant and all associated on-site infrastructure. It is proposed to construct the extension in 2 phases, phase 1 consisting of 4 ground floor laboratories, offices, stores and toilets and the first floor welfare rooms and external roof top plant to a height of 8.1 metres at its highest point. Phase 2 will consist of 4 laboratories, offices and stores at ground floor to a height of 5.45 square metres. The external architectural treatment of the new extension will match the existing NIPBI building.
Raheens Barnahely Shanbally Ringaskiddy
A below ground foul pumping station, a below ground storm water pumping station, a below ground emergency storage tank, a 3.1m high control building and ESB substation, a 2.65m high chemical dosing unit, provision of a 2.15m high standby generator with acoustic barrier, a 1.5m high air handling unit with acoustic barrier, a 4m high mobile lifting gantry and a 2.4m high security fence along with indigenous plant screening. Pipework associated with the development includes a foul rising main along the R613, local roads and green fields from the foul pumping station to the Shanbally WWTP (c. 3km) as well as 3 no. short sections of pipeline (c. 136.5m in total) associated with the storm water pumping station and foul pumping station. Installation of 2 no. new reinforced concrete manhole chambers on existing pipeline will also be required. The development will also consist of all associated site work and site excavation works both above and below ground for the pumping stations, pipelines. The works will include the demolition of a derelict bungalow at proposed pumping stations site.
Barnahely, Raheens East Coolmore, Raheens Carrigaline East and Shanbally Ringaskiddy, Co. Cork
Single storey extension to existing NIPBI laboratory, 2 no. extensions to single storey NIPBI offices, external rooftop plant and all associated on-site infrastructure
Raheens Ringaskiddy
Construction of an extension to the western end of the existing surface level car park, consisting of 103 no. car parking spaces. It is proposed to construct the car park in 2 phases. Phase 1 will consist of 77 car spaces and phase 2 will consist of 26 car spaces. The development will include all associated on-site infrastructure.
Raheens/Barnahely/shanbally Ringaskiddy Co Cork
Planning permission is sought for construction of a new single storey equipment storage warehouse to the West of the existing project store with a floor area of 582.6sqm and 8m in height above ground, new two-storey training and development building to the Eastern side of the existing North South access corridor with a floor area of 836.6sqm and 11.6m in height above ground, a single storey cafeteria extension to the West of the existing administration building with a floor area of 154.8sqm and 3.3m in height above ground, a single storey office extension to the East of the existing administration building with a floor area of 154.8sqm and 3.3m in height above ground, a two-storey office and storage extension to the South of the existing East West connecting corridor at Production Building 1 with a floor area of 385.9sqm and 9.64m in height above ground, a two-storey office and storage extension to the South of the existing East West connecting corridor at Production Building 2 with a floor area of 448.1sqm and 9.64m in height above ground, A two-storey extension to the south of the existing NIPBI office building. The extension to the NIPBI building is to be built in 2 phases. Phase 1 will consist of ground floor offices with a floor area of 387.7sqm and a first floor plant room with a floor area of 96.5sqm and a maximum 5.88m in height above ground. Phase 2 will consist of ground floor offices with a floor area of 150sqm and a ground floor cafeteria of 74.5sqm and a maximum of 3.15m in height above ground. An extension to the Southern end of the existing surface level car park for an additional 40no. cars is included in this application. The development will include all associated on-site infrastructure.
Raheens Barnahely Shanbally Ringaskiddy, Co.Cork
Construction of 84 no. space extension to existing car park, realignment of existing adjacent site road to accommodate car park extension, provision of associated drainage, lighting and landscaping
Raheens Ringaskiddy
Construction of a below ground foul pumping station incorporating a below ground emergency storage tank, a below ground storm water pumping station, a 3.1m high control building and ESB substation, a 2.65m high chemical dosing unit, provision of a 2.15m high standby generator with acoustic barrier, a 1.5m high air handling unit with acoustic barrier, a 4m high mobile lifting gantry and a 2.4m high security fence along with indigenous plant screening. Pipework associated with the development includes a foul rising main along the R613, local roads and green fields from the foul pumping station to the Shanbally WWTP (c. 3km) as well as 3 no. short sections of pipeline (c. 136.5m in total) associated with the storm water pumping station and foul pumping station. Installation of 2 no. new reinforced concrete manhole chambers on existing pipelines will also be required. The development will also consist of all associated site work and site excavation works both above and below ground for the pumping stations, pipelines. The works will include the demolition of a derelict bungalow at proposed pumping stations site.
Shanbally, Raheens, Coolmore, Barnahely Raheens East Ringaskiddy Co. Cork
Extension to main car park to provide 84 no. additional spaces and realignment of adjacent site road to accommodate the proposed car park extension
Novartis Ringaskiddy Ltd. Raheens/Barnahely Shanbally/Ringaskiddy
New two storey small scale development facility building, two storey mechancial and electrical workshop and single storey porch extension to existing waste water treatment control building
Raheens/Barnahely Shanbally/Ringaskiddy
Retention of a community sounder which comprises of three pairs of Klaxon sirens mounted at the top of a galvanised steel mast (110mm in diameter) which extends 2300mm above the parapet of the rooftop penthouse of the PP1 building
Novartis Ringaskiddy Ltd. Raheens Shanbally/Barnahely Ringaskiddy