Curraglass West Curraglass Mallow Co.Cork
INCOMPLETED APPLICATIONPlanning application 25/4027
Cork - Cork County Council
Proposed Development
Permission for: 1) Part demolition of an existing two storey dwelling house and full demolition of an existing single storey rear extension and the reconstruction of the former dwelling house with part two storey and part single storey extensions. 2) Decommission the existing septic tank and soakpit and install a new waste water treatment system and percolation area. 3) Access from the existing vehicular road entrance together with all ancillary site works.
View the full application file on the council's planning portal →Application Timeline
Application received
15 Jan 2025
Decision due
11 Mar 2025
Application Details
- Location
- Curraglass West Curraglass Mallow Co.Cork.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 15 January 2025
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 11 March 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for:- 1) Part demolition of an existing two storey dwelling house and full demolition of an existing single storey rear extension and the reconstruction of the former dwelling house with part two storey and part single storey new extensions, 2) Demolition of an existing garge and alterations to front façade of dwelling, 3) Decommission the existing septic tank and soakpit and install a new waste water treatment system, 4) Access from the existing vehicular road entrance together with all ancillary site works.
Curraglass West Curraglass Mallow Co.Cork
Permission for the construction of a storey and a half style dwelling with adjoining carport, domestic vehicular entrance & bridge, septic tank with percolation area and all associated site works
Blackpool Curraglass Mallow Co.Cork
Construction of slatted unit, soiled water store, slurry store and all associated site works
Lisnabrin Lower Curraglass Mallow
Extension to dwellinghouse
Curraglass West Curraglass Mallow
Extension to dwelling
Curraglass West Curraglass Mallow
The upgrading of the existing waste water treatment plant, the construction of a 814 sq.m lined treatment wetland, the installation of a sand filter, a pumping station and 1.5km 12 bar 32mm OD MDPE underground effluent discharge pipe in a wayleave through farm land in Rosybower, Curraglass, Mallow to the Bride River. The existing effluent percolation system will be decommissioned and the effluent from the fish processing plant will be then discharged to the Bride River
Blackpool Rosybower Curraglass Mallow
The upgrading of the existing waste water treatment plant, the installation of a lined treatment wetland, the installation of a sand filter, a pumping station and a 1.5km 12 Bar 32mm OD MDPE underground effluent discharge pipe in a wayleave through farm land in Rosybower Curraglass Mallow to the Bride River. The existing effluent percolation system will be decommissioned and the effluent from the fish processing plant will be then discharged to the Bride River
Curraglass Blackpool & Rosybower Mallow Co. Cork
Seafood processing facility including associated site works and effluent treatment plant
Curraglass Blackpool Mallow
The upgrading of the existing waste water treatment plant, the installation of a lined treatment wetland, the installation of a sand filter, a pump station and a 1.5km of 12 bar 32mm OD MDPE pipe to the Bride River. The existing effluent percolation system will be decommissioned and the effluent from the fish processing plant will be then discharged to the Bride River. In conjunction with the planning application Carr Fish Limited will also apply for a new Discharge License to discharge the final treated effluent to the river.
Curraglass Mallow Co. Cork
The upgrading of the existing waste water treatment plant, the installation of a lined treatment wetland, the installation of a sand filter, a pump station and a 1.5km of 12 bar 32mm OD MDPE pipe to the Bride River. The existing effluent percolation system will be decommissioned and the effluent from the fish processing plant will be then discharged to the Bride River. In conjunction with the planning application Carr Fish Limited will also apply for a new Discharge License to discharge the final treated effluent to the river.
Blackpool Curraglass Mallow Co. Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?