← Back to search

34 Bank Place,, Mallow,, Co. Cork, P51 ED8W

Refused

Planning application 25/6545

Cork - Cork County Council

Proposed Development

Change Of Use Of Existing Building From Retail To Residential / A Dwelling, Including Minor Modifications To The Elevations.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Nov 2025

  2. Decision: Refused

    23 Jan 2026

  3. Decision due

    26 Jan 2026

Application Details

Location
34 Bank Place,, Mallow,, Co. Cork, P51 ED8W
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
21 November 2025
Status
Decision Issued
Decision
Refused
Decision Date
23 January 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
25/6232Invalid - Case Closed20 Oct 2025

Change Of Use Of Existing Building From Retail To Residential / A Dwelling, Including Minor Modifications To The Elevations.

34 Bank Place, Mallow, Co. Cork, P51 ED8W

38m
19/5658REFUSED27 Jun 2019

Convert basement of existing dwelling to apartment and all associated site works

No. 10 Elm Court Fair Street Mallow Co. Cork

43m
22/5918INCOMPLETED APPLICATION22 Aug 2022

Development, reconstruction and refurbishment of existing 3 storey building at no. 142 and 143 Bank Place, Thomas Davis Street & Hibernian Way, Mallow, Co.Cork. Refurbishment and reconstruction of vacant first and second floors of 142 and 143 bank place and existing extension to the rear of no. 142 bank place, to provide 4 no. housing units and salon consisting of the following works: The development of 4 no. apartments at first and second floor levels in vacant former residential upper floors of 142 and 143 bank place and a salon to the rear of 142 bank place at ground and first floor levels. Accessed via Hibernian way to include: (1) permission for the following: replacement of rear of slate roof of 142 bank place, replacement of existing galvanised roof to the rear of first floor at 142 bank place, demolition and rebuilding of upper front and rear facades of 142 bank place, replace new windows to match existing at 143 bank place, openings in existing party wall between 142 and 143 bank place, at first and second floor levels, change of use to residential of (14.5sq.m) section of rear ground floor at 142 to provide new stairway access to upper floors of both buildings, change of use to salon (49sq.m), Construction of extension of access lobby for proposed apartments at first and second floor levels (5.3sq.m.) to rear of 143 bank place, Construction of second floor extension (14.5sq.m.)to the rear of 142 bank place, for access to proposed apartments. Modification to elevation at first and seconf floors to the front of 142 Bank Place. (2) retention of demolition of fire damaged elements and rebuilding works to damaged upper floor of 142 & 143 bank place to include, removal of existing first and second floors and associated elements, removal of external wall to the rear of 143 at first and second floor levels. (3) retention of constructed elements listed below; external wall/flat roof to the rear of no 143 bank place as constructed, internal wall at ground floor at rear of no 142 bank place. Construction of first and seconds floors as constructed, metal fabrication and other structural works as constructed, deemed necessary to support existing structure, exposure of existing windows in Hibernian way. The proposed development is within the mallow town centre architectural conservation area.

142/143 Bank Place, Thomas Davis Street, Hibernian Way, Mallow Co.Cork

43m
22/6166Conditional Permission28 Sept 2022

Development, reconstruction and refurbishment of existing 3 storey buildings at no’s 142 and 143 Bank Place, Thomas Davis Street & Hibernian Way, Mallow, Co.Cork. Refurbishment and reconstruction of vacant first and second floors of 142 and 143 Bank Place and existing extension to the rear of no. 142 Bank Place, to provide 4 no. housing units and salon consisting of the following works; The development of 4 no. apartments at first and second floor levels in vacant former residential upper floors of 142 and 143 Bank Place and a salon to the rear of 142 Bank Place at ground and first floor levels, accessed via Hibernian Way to include; (1) Permission for following: Replacement of rear of slate roof of 142 Bank Place, replacement of existing galvanized roof to the rear of first floor at 142 Bank Place, demolition and rebuilding of upper front and rear facades of 142 Bank Place, replace new windows to match existing at 143 Bank Place, openings in existing party wall between 142 and 143 Bank Place at first and second floor levels, change of use to residential of (14.5 sqm) section of rear ground floor at 142 to provide new stairway access to upper floors of both buildings. Change of use of salon (49 sqm), construction of extension of access lobby for proposed apartments at first and second floor levels (5.3 sqm) to the rear of no 143 Bank Place, construction of second floor extension (14.5 sqm) to the rear of no 142 Bank Place, for access to proposed apartments, Modifications to elevation at first and second floors to the front of no 142 Bank Place. (2) Retention of demolition of fire damaged elements and rebuilding works to damaged upper floor of 142 and 143 Bank Place to include; removal of existing first and second floors and associated elements, removal of external wall to rear of 143 at first and second floor levels. (3) Retention of constructed elements listed below: external wall/flat roof to rear of no 143 Bank Place as constructed, internal wall at ground floor at rear of no 142 Bank Place, construction of first and second floors as constructed, metal fabrication and other structural works as constructed, deemed necessary to support existing structure, Exposure of existing windows in Hibernian Way. The proposed development is within the Mallow town centre architectural conservation area.

142/143 Bank Place Thomas Davis Street and Hibernian Way Mallow, Co. Cork

43m
22/5695INCOMPLETED APPLICATION19 Jul 2022

Development, reconstruction and refurbishment of existing 3 storey building at no. 142 and 143 Bank Place, Thomas Davis Street & Hibernian Way, Mallow, Co.Cork. Refurbishment and reconstruction of vacant first and second floors of 142 & 143 Bank place and existing extension to the rear of no. 142 Bank place, to provide 4 no. housing units and salon consisting of the following works: the development of 4 no. apartments at first and second floor levels in vacant former residential upper floors of 142 and 143 bank place and a salon to the rear of 142 bank place at ground and first floor levels. Accessed via Hibernian Way to include: (1) permission for the following: replacement of rear of slate roof of 142 bank place, replacement of existing galvanized roof to the rear of first floor at 142 bank place, demolition and rebuilding of upper front and rear facades of 142 bank place, replace new windows to match existing at 143 bank place, openings in existing party wall between 142 and 143 bank place, at first and second floor levels, change of use to residential of (14.5 sq.m) section of rear ground floor at 142 to provide new stairway access to upper floors of both buildings, change of use of salon (49 sq.m), construction of extension of access lobby for proposed apartments at first and second floor levels (5.3 sq.m) to the rear of no 143 bank place, construction of second floor extension (14.5 sq.m) to the rear of no 142 bank place, for access to proposed apartments, modifications to elevation at first and second floors to the front of no 142 bank place. (2) Retention of demolition of fire damaged elements and rebuilding works to damaged upper floor of 142 and 143 Bank Place to include: removal of existing first and second floors and associated elements, removal of external wall to rear of 143 at first and second floor levels. (3) Retention of constructed elements listed below: external wall/flat roof to the rear of no 143 Bank Place as constructed, internal wall at ground floor at rear of no. 142 Bank place, construction of first and second floors as constructed, metal fabrications and other structural works as constructed, deemed necessary to support existing structure, exposure of existing windows in Hibernian Way. The proposed development is within the mallow town centre architectural conservation area.

142/143 Bank Place, Thomas Davis Street Hibernian Way Mallow Co. Cork

44m
21/6217INCOMPLETED APPLICATION10 Aug 2021

Refurbishment and reconstruction of vacant first and second floors of 142 and 143 Bank Place and existing extension to the rear of no. 142 Bank Place, to provide 5 no housing units, consisting of the following works: The partial change (34sqm) of use of rear of 142 Bank Place/Hibernian Way from retail to residential use, to provide access to 4 No upper floor apartments in 142 and 143 Bank Place and to a single duplex dwelling unit over the ground and first floors, accessed via existing entrance on Hibernian Way. Reconstruction, modifications and replacement of the existing roof area to the rear of 142 and 143 Bank Place including addition of a new flat roof to the rear, the raising of existing flat roof and the provision of balconies to apartments. Alterations to elevations including the provision of new windows, the reconstruction of sections of the façade wall to the front and rear of 142 and 143 Bank Place, at first and second floor levels and the duplex dwelling unit on Hibernian Way. Internal restoration of upper floors and associated site works, including lighting and drainage, with refuse storage to be provided at an existing secure area on Hibernian Way. Retention of (a) remedial supporting works to upper floors of both 142 and 143 Bank Place and on Hibernian Way, (b) reopening of 2 no. existing windows to Hibernian Way. The proposed development is within the Mallow Town Centre (ACA-1) Architectural Conservation Area.

142/143 BankPlace/ Hibernian Way Thomas Davis Street Mallow, Co. Cork

44m
21/5938INCOMPLETED APPLICATION12 Jul 2021

Refurbishment and reconstruction of vacant first and second floors of 142 and 143 Bank Place and existing extension to the rear of no. 142 Bank Place, to provide 5 No housing units, consisting of the following works: The partial change (34sqm) of use of rear of 142 Bank Place/Hibernian Way from retail to residential use, to provide access to 4 No upper floor apartments in 142 and 143 Bank Place and to a single duplex dwelling unit over the ground and first floors, accessed via existing entrance on Hibernian Way. Reconstruction, modifications and replacement of the existing roof area to the rear of 142 and 143 Bank Place including addition of a new flat roof to the rear, and the raising of existing flat roof. Alterations to elevations including the provision of new windows, the reconstruction of sections of the façade wall to the front and rear of 142 and 143 Bank Place, at first and second floor levels and the duplex dwelling unit on Hibernian Way. Internal restoration of upper floors and associated site works, including lighting and drainage, with refuse storage to be provided at an existing secure area on Hibernian Way. Retention of (a) remedial supporting works to upper floors of both 142 and 143 Bank Place and on Hibernian Way, (b) reopening of 2 no. existing windows to Hibernian Way. The proposed development is within the Mallow Town Centre (ACA-1) Architectural Conservation Area.

142/143 Bank Place Thomas Davis Street Mallow Co. Cork

47m
07/55069CONDITIONAL11 Sept 2007

Construct a new window with shopfront surrounds

Hibernian Way Mallow Co Cork

47m
05/55006NEW APPLICATION28 Jan 2005

Permission for retention of existing retail unit

Hibernian Way Off Main Street Mallow Co. Cork.

48m
19/4413WITHDRAWN22 Feb 2019

Development, reconstruction and refurbishment of existing 3 storey buildings to consist of: 1) Change of use of ground floor office unit at No. 143 and amalgamation with ground floor retail unit at No. 142 to provide 1 no. retail unit. 2) Refurbishment of unused residential first and second floors and construction of extensions to rear with balconies to provide 2 no. apartments on each floor. 3. Partial demolition at ground, first floor and second floor levels, construction of a 3 storey extension to rear to provide access to apartments, storage, common areas and ancillary facilities. 4. Alterations to elevations, reconstruction, increase in roof height of No. 142, provision of solar panels, 2 no. security gates, lighting, signage and landscaping.

142 and 143 Bank Place Thomas Davis Street and Hibernian Way Mallow Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?