← Back to search

Fiddane, Charleville, Co. Cork, P56 NC84

Grant with Conditions

Planning application 25/6728

Cork - Cork County Council

Proposed Development

Permission to

  1. (a)
    demolish a rear single storey extension, chimneys and rear dormer type window of the existing dwelling house
  2. (b)
    demolish an existing rear single storey storage type building
  3. (c)
    Permission to construct a two storey rear extension and a single storey link section and alterations to the existing dwelling house
  4. (d)
    Permission to install a wastewater treatment plant and soil polishing filter and all associated site works.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Dec 2025

  2. Decision: Grant with Conditions

    30 Jun 2026

  3. Decision due

    2 Jul 2026

  4. Grant issued

    14 Aug 2026

Application Details

Location
Fiddane, Charleville, Co. Cork, P56 NC84.
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
9 December 2025Other applications received that week
Status
Application Closed
Decision
Grant with Conditions
Decision Date
30 June 2026
Grant Date
14 August 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

40m
10/5418WITHDRAWN9 Jun 2010

Dwellinghouse, entrance and septic tank

Fiddane Charleville

119m
04/4320CONDITIONAL14 Jun 2004

Dwellinghouse

Fiddane Ballyhea Charleville

153m
11/4151CONDITIONAL31 Jan 2011

Construction of garage to rear of dwelling and retention of raising level of roof and conversion of attic to living accommodation with 3 no. velux rooflights to rear and 2 no. dormer windows to front of dwelling and septic tank and percolation area to rear

Ardglass Charleville Co Cork

153m
10/8167INCOMPLETED APPLICATION8 Oct 2010

Permission to construct garage to rear of dwelling and retention of raising level of roof and conversion of attic to living accommodation with 3 no. velux rooflights to rear and 2 no. dormer windows to front of dwelling

Ardglass Charleville

153m
05/5834CONDITIONAL15 Aug 2005

Dwelling

Ardglass Charleville

305m
06/11859INCOMPLETED APPLICATION31 Oct 2006

Demolition of cottage and part of stable and construction of new bay window and boiler house and retention of sunroom and 2 no. bay windows, change of back addition hiproof to gable and use of utility roof as balcony and change of balcony railing to concrete balustrade

Ardglass Charleville

307m
06/12606CONDITIONAL23 Nov 2006

Demolition of part of stable and part of dwellinghouse (original cottage) and construction of detached boiler house, installation of bay window to dwellinghouse and retention of sunroom, 2 no. bay windows, rear hip roof to gable, use of utility roof as balcony and change of balcony railing to concrete balstrade

Ardglass Charleville

509m
20/5460CONDITIONAL13 Jul 2020

Retention and completion of an extension to gable end of existing dwelling and permission for construction of a new vehicular entrance

Ardglass Charleville Co. Cork

630m
22/6536CONDITIONAL14 Nov 2022

Permission to amend the design of the previously approved development (planning reference: Cork County Council 17/5799 & an Bord Pleanála ABP-306915-20)which comprises consent for a 67.8 hectare Solar PV farm at Fiddane, Ballyhea Charleville, Co.Cork. The proposed amendments include; (1) increase in number of transformers, (2) reduction in the spacing of Solar PV rows (strings), (3) increase in size and configuration of solar panels, (4) overall increase in solar power generation, (5) change in solar panels tilt (degree), (6) minor reduction in the height of solar array, (7) operational period proposed to be extended from 30 to 40 years. A Natura Impact Statement will be submitted to the planning authority with this application.

Fiddane Ballyhea Charleville Co.Cork

630m
19/6965WITHDRAWN13 Dec 2019

The development of a 67.8 hectare solar PV farm. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures 2.1m in height, together with 1 single storey ESB control room, 9 electrical transformation enclosures, underground cabling, CCTV poles and cameras, deer type security fencing, site entrance, hardstanding area, landscaping along part of the northern site boundary and other associated development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will be submitted to the planning authority with this application.

Fiddane Townland Ballyhea Charleville Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?