Gortnagross, Mallow, Co. Cork
Invalid - Prepare LettersPlanning application 26/0281
Cork - Cork County Council
Proposed Development
A 10-year permission for a solar farm consisting of solar photovoltaic panels on ground-mounted frames, one single-storey transformer station, internal access tracks, security fencing, CCTV, landscaping, and all associated site development works. The proposed development represents an extension to the solar farm permitted under Cork County Council Planning Permission References: 15/7003, 22/5174 and 21/4498. The solar panels and associated infrastructure are arranged within a total developable site area (including ancillary works) of 8.72 ha at Gortnagross, Mallow, Co. Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with sections 34D(b), the provision of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Application Details
- Location
- Gortnagross, Mallow, Co. Cork
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 9 February 2026
- Status
- Invalid - Prepare Letters
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
A 10-year permission for a solar farm consisting of solar photovoltaic panels on ground-mounted frames, one single-storey transformer station, internal access tracks, security fencing, CCTV, landscaping, and all associated site development works. The proposed development represents an extension to the solar farm permitted under Cork County Council Planning Permission References: 15/7003, 22/5174 and 21/4498. The solar panels and associated infrastructure are arranged within a total developable site area (including ancillary works) of 8.72 ha at Gortnagross, Mallow, Co. Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.
Gortnagross, Mallow, Co. Cork
Modifications to the solar farm permitted under planning reg no. 15/7003 & extended under 21/4498 at Gortnagross, Mallow, Co.Cork. The modifications consist of changes to the dimensions of the permitted photovoltaic panels, replacement of the 2 transformer stations with 1 smaller transformer station and 1 smaller storage unit, changes to the design of the delivery station and associated layout changes. All modifications are within the boundary of the permitted development.
Gortnagross Mallow Co.Cork
A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 15.38 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV and all associated ancillary development works.
Gortnagross Mallow Co. Cork
A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 15.38 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV and all associated ancillary development works. - Extension of duration of permission granted under planning reference: 15/7003
Gortnagross Mallow Co. Cork
Construction of split level dwellinghouse and garage
Gortnagross Ballyclough Mallow
To construct a two storey dwelling with adjoining garden store, domestic waste water treatment system, new site entrance with walls and piers and all associated site works.
Gortnagross Mallow Co. Cork
Construct a two storey dwelling, domestic waste water treatment system, new site entrance with walls and piers and all associated site works.
Gortnagross Mallow Co. Cork
Construction of dwelling and treatment unit and installation of treatment unit to serve the existing dwelling
Gortnagross Mallow
Dwellinghouse and treatment unit and installation of treatment unit to serve existing dwelling
Gortnagross Mallow
Construction of extension to dwellinghouse and retention and completion of stable buildings and associated site works
Gortnagross Mallow
The submission window has closed
Observations on this application closed on Sunday 15 March 2026, five weeks after it was received. The authority cannot accept a late submission.